Laserfiche WebLink
MATCHLINE — SEE DWG 45—YD—M110-08 <br />45-011 <br />I <br />I <br />M110-11 <br />11 MM568 <br />I ❑ M110— <br />as—zs1 <br />0 <br />,1473 <br />Y ti <br />� ND 115 � <br />FILE <br />x <br />M <br />REVISION BY APPROVED DATE <br />RECORD DRAWING EDC 11347705 DLR GRP NJW 12.02.13 <br />45-900 ADDITION W2560422 M GOMEZ 8-27-14 <br />STALL 113 TRAILERS C243685 EG DH/KM 01.27.23 <br />REVISION <br />--- -- -- -- -- -- -- --- <br />MATCHLINE —SEE DWG 45—YD—M110-17 <br />PARTIAL PLAN N <br />SCALE: 1" = 40' <br />APPROVED DATE ACCEPTABILITY <br />THIS DESIGN AND/OR <br />SPECIFICATION IS APPROVED <br />BOE/A/G ® APPROVED BY DEPT C <br />LEGEND <br />CW WATER <br />I <br />---- A---- A— AIR <br />B POC TO EXISTING <br />POC =POINT OF CONNECTION <br />GENERAL NOTES <br />1. THE LOCATIONS OF EXISTING UTILITIES AND FEATURES <br />SHOWN ARE APPROXIMATE. CONTRACTOR SHALL VERIFY <br />ACTUAL LOCATIONS PRIOR TO CONSTRICTION. <br />CONTRACTOR SHALL BE CAUTIOUS WHEN EXCAVATING <br />NEAR EXISTING UTILITIES. <br />B O E 1 N 2 REFER TO SHEET CDIRE DETAIL 2 FOR TRENCHING <br />REQUIREMENTS OF DIRECT BURIED PIPING. <br />I <br />3. CONTACT ENGINEERING FOR INSPECTION OF PIPING <br />INSTALLATION BEFORE BACKFILL OF DIRECT BURIED <br />PIPING. <br />LAKE � CONSTRUCTION NOTES <br />AIR AND WATER <br />TLE STALL 113 TRAILERS <br />SITE 45-YD <br />ECHANICAL MASTER <br />POT HOLE AND VERIFY EXISTING PIPE MATERIAL <br />AND SIZE AND NOTIFY ENGINEERING IMMEDIATELY. <br />TIE—IN METHOD TO BE COORDINATED DURING <br />CONSTRUCTION. <br />PROVIDE NEW CURBSTOP VALVE WITH ADJUSTABLE <br />VALVE BOX. SEE DETAIL FOR INSTALLATION. <br />NEW DIRECT BURIED COLD WATER PIPING TO <br />RESTROOM TRAILER 07-773. <br />PIPING MATERIALS: <br />* TUBING — TYPE—K COPPER, ASTM B-88. <br />PROVIDE POLYWRAP AROUND DIRECT BURIED <br />PIPING (CHRISTY'S, POLY WRAP C OR <br />APPROVED). <br />* FITTINGS — WROUGHT 616.22 SOLDER JOINT. <br />* INSULATION — 1-1/2" FIBERGLASS <br />INSULATION CONFORMING TO ASTM C547. <br />PROVIDE 0.010" FIELD APPLIED STAINLESS <br />STEEL JACKETING AND FITTING COVERS WITH <br />VAPOR BARRIER. <br />**NOTE: PIPE MATERIALS, SIZES AND <br />BACKFILLING DETAILS DEPICTED ON THESE <br />DRAWINGS ARE TO BE CONFIRMED DURING <br />CONSTRUCTION AND DEPENDENT ON PIPE MATERIAL <br />DISCOVERED DURING POT —HOLING. <br />MO <br />�I <br />KEY PLAN <br />SCALE: NONE N <br />40 20 0 20 40 80 <br />SCALE: 1:40 <br />CURRENT REVISION SYMBOL DATE <br />C243685 B 01.27.22 <br />SHEET <br />M110-12 <br />JOB NO. COMP NO. <br />01.27.23 DWG NO. 45—YD—M110-12 <br />(PAPER SPACE) SEE: 45—YD—M110.DWC <br />