Laserfiche WebLink
Install York TMBV <br />furnace. Install 4" <br />2 Stage capacity with full variable <br />media filter. Reuse existing Wyze <br />blow( <br />thermostat. Pull new wire. Install new 2nd floor r turn usir <br />existing 8.5" x 15" return riser as feed. Use front ewing <br />room closet o route return. (Framing Sheetrock & Paint <br />Excluded). li <br />garage at bC <br />linehide tran <br />furnace loca <br />stall York YCD30 AC unit on right s' a of <br />�k corner. Route refrigeration lines i paintab <br />Pitioning into garage at ceiling heigh over to <br />ion. Route condensation lines out fr nt of <br />garage. Route-o=BLftmiorrcffmifoAG--on-outsi wall of <br />garage in conduit. <br />LINESET <br />ROUTE <br />4-- ` ,, <br />r <br />M8V060 12 <br />0 <br />0 <br />YCD3 <br />r <br />.. <br />ELEC <br />ROUTE <br />200 AN <br />PANEL <br />