My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
910 91ST PL SW 2023-10-23
>
Address Records
>
91ST PL SW
>
910
>
910 91ST PL SW 2023-10-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 11:48:21 AM
Creation date
10/19/2023 11:35:27 AM
Metadata
Fields
Template:
Address Document
Street Name
91ST PL SW
Street Number
910
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2103-075 Description: CIRCUIT:PV SOLAR ROOF MOUNT&MAIN ELECTRICAL <br /> PANEL UPGRADE <br /> Applied:3/12/2021 Approved:3/12/2021 Site Address: 910 91ST PL SW <br /> Issued:3/12/2021 Finaled: 5/19/2021 City,State Zip Code: EVERETT,WA <br /> Status:ARCH IVED-FINALED Applicant: NIKKI RELYEA <br /> Parent Permit: 82103-042 Owner:SMITH DISMAS E&SHANNON K <br /> Parent Project: Contractor:SOLGEN POWER(ELEC)LLC <br /> Details: <br /> **MANUFACTURER SPEC TO BE ONSITE FOR BLDG INSPECTOR TO REFER TO** <br /> CIRCUIT: PV SOLAR ROOF MOUNT&MAIN ELECTRICAL PANEL UPGRADE <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 5/10/2021 5/10/2021 ELEC 06-ROUGH IN TODD JOHNS PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 5/5/202110:11 AM SOLGEN POWER(ELEC)LLC <br /> replacing load center.main panel upgrade. <br /> Contact Name:SOLGEN POWER(ELEC)LLC <br /> Site Address:910 91ST PL SW <br /> Phone:5095962254 <br /> e-Mail:PERMITTING@SOLGENPOWER.COM <br /> (5/10/20213:41 PM T110) <br /> Okayed for pud reconnect <br /> Grounding electrode conductor needed to water <br /> Ground rods need to be driven to flush,wire buried to 12"deep <br /> Pv sysrem tie in not complete,will inspect full pv system when ready <br /> Branch circuits inspected when ready <br /> 5/18/2021 5/18/2021 ELEC 09-FINAL TODD JOHNS APPRVD-PERMIT <br /> FINAL <br /> Notes: <br /> I <br /> Printed:Thursday, 19 October, 2023 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.