Laserfiche WebLink
VESDA <br />CONTROL PNL. <br />25 POST <br />OST <br />TO 120VAC E3D <br />COL` E-3�75 �0> <br />2A,B,C,E <br />(IN TREN H) <br />— — — - — <br />o <br />f <br />De <br />Df <br />(Dg__VIESD4 CABLE CONNE TOR <br />J-BOX IN TRENCH <br />F J N3 <br />VDU <br />VESD AMPLI <br />NETWORK HOSE INTO A/P. <br />I <br />V SDP <br />CONTR L PNL 2A,B,C,E (IN TR CH) <br />POS. <br />3#10 SHUNT TRIP <br />TO 120VAC DED. KT. B 0) ° PNL. EPS-3 <br />�2A,3#10 x — x <br />A VCR E <br />TO 120VAC DED. 0) 0) <br />CKT' 2A,B� <br />40-22/23 BLD . <br />VESDA MAIN FIR <br />PANEL <br />2A <br />F <br />F' <br />.9 1 <br />8' 4' 0 4' 8' <br />I <br />I <br />VESDA AIR SAMPLING <br />_ NETWOR_K OSE TO A� <br />VC, <br />A DETECTOR UP <br />VDU <br />0) F <br />'0 I-TImi------- - <br />VE CABLE CO NECTOR / <br />J-BOX TRENCH <br />/ <br />�vv vv v v� <br />TO 40-21 BLDG. <br />VCP-3, COL. C-5 <br />TO 40-21 BLDG. <br />VCP-2, COL. B-4.5 <br />4.5 <br />3#10 F <br />TO 120VAC LED. CKT. <br />X � <br />�1 BLDG. <br />CONNECTION AT A-7.5 <br />40-21/22 <br />BLDG. VESDA <br />® MAIN FIRE <br />PANEL <br />44 VES[ d AIR SA PILING <br />(NETWORK/)HOSE INT� A/P. <br />VD <br />2A,6 PNL. <br />SHUN <br />R fTO VESDA CONTROL PNL VCP EPS <br />POS. 1, COL. D-33#10 3 1 (°) <br />TO 120VA� DE6 CRT. VESDA <br />CONTROL P L <br />TO 40-23 BLDG. 2A B POS. 2 x- <br />VCP-1, COL. G-1.5 <br />-TO BOEING INTRANIE <br />CONNECTION x 1 C <br />-TO BUILDING-FACP <br />CONNECTI0N-- <br />1.5 2 2.5 3 3.5 <br />16' <br />EQUIPMENT LEGEND — 40-22 BLDG. AIRCRAFT VESDA SYSTEM <br />SYMBOL <br />QTY <br />NEW <br />CITY <br />EXIST. <br />DESCRIPTION <br />PART NUMBER <br />MFG. <br />MFAP I (a) <br />- <br />1 <br />MAIN FIRE ALARM PNL ASSY., 40-22 <br />XLS (EXIST.) <br />SIEMENS <br />MFAP (b) <br />1 <br />- <br />MAIN FIRE ALARM PNL ASSY, 40-21/22 <br />CERBERUS PRO MODULAR <br />SIEMENS <br />BAT <br />2 <br />1 <br />BATTERY ENCLOSURE <br />CABB-BAT-R <br />SIEMENS <br />VCP I (a) <br />1 <br />3 <br />VESDA CONTROL PANEL ASSY. <br />EXIST. <br />VDU (a) <br />1 <br />3 <br />VESDA DETECTOR PNL. ASSY. <br />EXIST. <br />VCP 1 (b) <br />I 1 <br />3 <br />VESDA CONTROL PANEL ASSY. <br />SEE DWG 110773-FA351-0 <br />VDU (b) <br />1 <br />3 <br />VESDA DETECTOR PNL. ASSY. <br />SEE DWG 110773-FA352-0 <br />so <br />1 <br />3 <br />HORN/STROBE COMBINATION UNIT <br />MTH-MC-R <br />SIEMENS <br />FV-P-S-1 <br />1 <br />3 <br />VESDA POWER SUPPLY, 24 VDC, 4 AMP <br />AL4000LX <br />ALTRONIX <br />® <br />- <br />1 <br />RELAY IN ENCL, POWER SHUTDOWN INTERFACE <br />EXIST. <br />M R(a) <br />- <br />3 <br />ADDRESSABLE FA MONITOR MODULE W/RELAY <br />HTRI-R <br />SIEMENS <br />M R(b) <br />2 <br />- <br />ADDRESSABLE FA MONITOR MODULE W/RELAY <br />XTRI-R <br />SIEMENS <br />CJ <br />1 <br />- <br />VESDA CONNECTOR JUNCTION BOX ASSY. <br />SEE DWG 111009-FA315-0 <br />NCE <br />1 <br />- <br />NETWORK COMMUNICATIONS ENCLOSURE <br />SEE DWG 110773-FA307-0 <br />0 <br />1 <br />3 <br />MANUAL STATION & MTG. BOX <br />GE <br />103-23 & 103-25 <br />FE-P-S-1 <br />1 <br />3 <br />EMERGENCY POWER SHUTDOWN PNL. <br />BY BOEING/ELEC. CONTR. <br />0 <br />2 <br />- <br />I SMOKE DETECTOR, PHOTOELECTRIC <br />OP921 <br />SIEMENS <br />REVISION <br />REVISION <br />2A,2B <br />�2A,' <br />213 <br />5.5 <br />a <br />6 <br />TO 120VAC QED. CKT. <br />_ .�, b) SHUNT TRIP <br />3 2A,2B <br />PNL. EPS-4� <br />P EPS <br />cJVESDA CABLE CONNECTOR <br />(b) TO BOEING <br />CAT5 4ONNETWETWOCTIONIENCL. <br />JBOX ON UTILITY RACK <br />11' 2ABCE© <br />CONTROL <br />6 PNL.4 <br />COMMUNICA I <br />F® <br />VESDA ONS <br />ENCL. <br />3 <br />VDU b <br />C <br />POSIT( IN 4 <br />I <br />I <br />I <br />TRIP _ a <br />'S-2 <br />..-��--®--- --tea--- <br />4.5 5O 5.5 6 6.5 7 <br />4022 BLDG. VESDA SYSTEM OVERALL PLAN <br />SCALE: 1/32"=1' <br />2 INSTALL NEW MAIN VESDA FAR AT COL D-5 TO SERVE © PROVIDE NEW RED 8X8X4 VESDA CONNECTOR J-BOX <br />NEW 40-21 VESDA SYSTEM AND NEW 40-22 VESDA ON UTILITY RACK W/ RECEPTACLE (TYP. BAYONET, 12 <br />SYSTEMS. SOCKET, ITT CANON P/N CB2-24A24SS). LABEL THE <br />J-BOX TO READ: "VESDA SMOKE SYSTEM". SEE <br />I INSTALL NEW VESDA COMMUNICATIONS EQUIPMENT DRAWING 40-022-1E112 FOR UTILITY RACK <br />ENCLOSURE ADJACAENT TO VESDA MAIN FAR AT D-5. LOCATION. <br />PROVIDE/INSTALL CONNECTION TO BOEING INTRANET. CART MOUNTED VESDA DETECTOR UNIT ASSEMBLY <br />WITH CAGED HORN/STROBE. POSITION NEAR AIRPLANE <br />I� PROVIDE CONDUIT/WIRE BETWEEN VESDA MFAP & NOSE. PROVIDED BY SEATRONICS. <br />EXIST. 40-21 BLDG. FACE. CONTACT BLDG. FACP <br />PROVIDER FOR WIRE REQUIREMENTS, MIN. 3 CIRCUITS ® PROVIDE UMBILICAL CABLE WITH APPROPRIATE LENGTH <br />FOR BLDG. FACP TO MONITOR VESDA MFAP ALARM, AND COMPATIBLE PLUG TO CONNECT THE VESDA <br />SUPERVISORY & TROUBLE. DETECTION CART TO THE RECEPTACLE ON UTILITY <br />RACK. CABLE IS PROVIDED ATTACHED TO THE VESDA <br />16. PROVIDE FINAL TERMINATION, START-UP, SITE VESDA DETECTOR UNIT, CABLE BY SEATRONICS. <br />GRAPHICS AND ALARMING MODIFICATIONS, AND TESTING <br />AND COMMISSIONING SERVICES FROM SEATRONICS, PROVIDE NEW 787 COMPATIBLE AIR SAMPLING HOSE. <br />INC. <br />PROVIDE FIRE ALARM SYSTEM ADDRESSABLE <br />17. NEW VESDA SYSTEM EQUIPMENT PROVIDED BY <br />MONITOR/RELAY MODULES FOR ACTIVATION CONTROL <br />SEATRONICS. EQUIPMENT IS TO BE MOUNTED AND SUPERVISION OF FPS PANELS. LOCATE MODULES <br />/INSTALLED BY BOEING ELECTRICAL CONTRACTOR AS WITHIN 3 FEET OF EPS PNL. OBSERVE SEPARATION <br />REQUIRED. NEW ELECTRICAL RACEWAY AND REQUIREMENTS OF CLASS 1 CIRCUIT (ACTIVATION <br />CONDUCTORS PROVIDED AND INSTALLED BY CIRCUIT) FROM FA POWER LTD. MONITORING CIRCUITS. <br />ELECTRICAL CONTRACTOR. AIRPLANE EMERGENCY <br />POWER SHUTDOWN SYSTEM DESIGN PROVIDED BY INSTALL SMOKE DETECTOR ABOVE CONTROL UNIT. <br />BOEING, EQUIPMENT & INSTALLATION BY ELECTRICAL <br />CONTRACTOR. <br />BY I APPROVED LATE <br />7.5 8 '8.5) 9.5 10 10. 11 11' <br />D <br />14 <br />I I I II <br />r <br />II <br />`_)SITISS 5 <br />De <br />I I <br />— Dg <br />D WIRE/CABLE CODE: <br />�S NOTE: NO CABLE SUBSTITUTIONS WITHOUT APPROVAL FROM <br />SEATRONICS, INC. <br />I, A = CAROL WIRE C2534 OR BELDEN 9460, #18 AWG SHEILDED <br />TWISTED PAIR, STRANDED, JACKETED CABLE (.205" OD) TYPE C <br />B = BELDEN P/N 3107A (RS485 COMMUNICATION CABLE, 2 TWISTED <br />® _. - - 9 ®- SHEILDED PAIRS, 22 AWG, 120 OHM IMPEDANCE) (.356" OD) <br />C = 2-#10 AWG THHN STRANDED, (RED & BLACK) <br />® ® LE FE D = 2-#12 AWG THHN STRANDED (RED & BLACK) <br />0 To,® FE E = CAROL WIRE P/N C2536A #16 AWG SHEILDED TWISTED PAIR, <br />H7 <br />STRANDED, JACKETED CABLE (.307" OD) TYPE CM. <br />® �� ® ® /� F = CABLE TYPE 'SOOW', 12-#16 AWG. CAROL 09612 OR EQUAL <br />® ® �� ® (.70" NOM. OD) <br />- .. G = NOT USED <br />�- — H = #16 TFFN OR TEN STRANDED <br />I I I <br />CONSTRUCTION NOTES: <br />INSTALL VESDA SYSTEM POSITION PANEL AT COL. <br />D/6.5. WALK INSTALLATION WITH ENGINEER FOR <br />EXACT PANEL PLACEMENT. INSTALL NEW PANEL AND <br />DEVICE LABELS. PROVIDE ALL ANCILLARY DEVICES AND <br />APPURTENANCES INCLUDING NEW BATTERIES AND <br />POWER SUPPLY TO MAKE SYSTEM FUNCTIONAL, <br />INCLUDING HORN/STROBE AND MANUAL PULL STATION. <br />CONTROL PANEL TO BE LABELED BY A WA L&I <br />APPROVED TESTING LAB/ENGINEERING EVALUATION. <br />PROVIDE DEDICATED 120V EMERGENCY POWER CIRCUIT <br />AND WIRE TO POWER SUPPLY. SEE DRAWING <br />40-022-1E62 FOR DETAILS. <br />PROVIDE CONDUIT/WIRE BETWEEN VESDA SYSTEM <br />PANEL LOCATIONS AS SHOWN FOR INTER -PANEL <br />COMMUNICATIONS/SIGNALING. <br />4 - PROVIDE NEW EPS R4 PANEL AND WIRE TO VESDA <br />SYSTEM AND 480V POWER AS SHOWN. SEE E110 <br />SERIES FOR SHUNT TRIP WIRING CONNECTIONS AND <br />BOEING DRAWING 40-022-E506-17 FOR PANEL <br />WIRING DIAGRAM AND ENCLOSURE DETAILS. <br />INSTALL POSITION PANEL TO VESDA CART CABLE <br />CONNECTION J-BOX AS SHOWN. ALL CONDUIT BODIES <br />AND J-BOXES ARE TO BE PAINTED RED. <br />0 <br />GENERAL NOTES <br />1. SEE DWG. 110773-FA101, 40-22 VESDA SYSTEM <br />ONE LINE DRAWING. <br />2. SEE DWG. 110773-FA121, 40-21 VESDA SYSTEM <br />ONE LINE DRAWING. <br />3. SEE DWG. 110773-FA221, 40-21 OVERALL VESDA <br />SYSTEM PLAN, FOR EQUIPMENT LOCATIONS. <br />® SEE DWG. 110773-FA306, 40-21/22 VESDA <br />SYSTEM MFAP, FOR ASSY. & WIRING DETAILS. <br />SEE DWG. 110773-FA307, 40-21/22 VESDA <br />COMMUNICATIONS ENCLOSURE (VCE), FOR ENCL. <br />ASSY. DIAGRAM & WIRING DETAILS. <br />© SEE DWG. 110773-FA308, 40-21/22 VESDA <br />CONTROL PANEL WIRING INTERCONNECT DIAGRAM <br />DETAILS AND MOUNTING ELEV. <br />7� BOEING REFERENCE DRAWINGS: <br />40-022-E506-10 VESDA SHUNT TRIP RESET MAP <br />40-022-E506-11 POS. 1 EPS-R1 DETAILS <br />40-022-E506-12 POS. 3 EPS-R3 DETAILS <br />40-022-E506-16 POS. 2 EPS-R2 DETAILS <br />40-022-E506-17 POS. 4 EPS-R4 DETAILS <br />1 3 5 7 9 11 <br />.9 <br />NEW — <br />TD <br />9/18/06 <br />SEATRONICS <br />FIRE PROTECTION SERVICES <br />PO BOX A98 <br />AUBURN, WA 98071 <br />253-939-6060 <br />-PROPRIETARY— <br />THIS INFORMATION IS THE <br />PROPERTY OF SEATRONICS, <br />INC. <br />DOR DISCLOSED <br />WIHORIZ ON EN <br />AUTHORrzAnoN INC.FROM <br />SEATRONICS, NC. <br />1 <br />1— <br />" K <br />EQUIPMENT LOCATION OVERALL PLAN <br />TEMP. VESDA AT E-4.5 — <br />TD <br />7/9/07 <br />TITLE — <br />BOEING 40-22 BLDG. <br />AIRCRAFT FIRE DETECTION SYSTEM <br />D-F/1-11 EVERETT <br />DELETED FORMER Pos. 1 - <br />DELETEDZED <br />D <br />z/zz/os <br />CHECKED <br />ADDED NEW VESDA POS.1 — <br />TD <br />9/28/17 <br />APPROVED <br />787 BUILD BACK PROJECT — <br />TD <br />04/14/23 <br />APPROVED <br />i i it F <br />KEY PLAN BLDG. 40-022 <br />1 ' 1 1 <br />110773-FA201-D <br />