My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2612 SUMMIT AVE 2023-10-23
>
Address Records
>
SUMMIT AVE
>
2612
>
2612 SUMMIT AVE 2023-10-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 10:42:12 AM
Creation date
10/20/2023 10:42:11 AM
Metadata
Fields
Template:
Address Document
Street Name
SUMMIT AVE
Street Number
2612
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2205-075 Description: 1,400amp temp servc for job site. 1,200amp servc for trlrs <br /> Applied:5/11/2022 Approved: 5/11/2022 Site Address: 2612 SUMMIT AVE <br /> Issued:5/11/2022 Finaled: City,State Zip Code: EVERETT,WA 98201 <br /> Status:ARCHIVED-NOT FINALED Applicant: RUSS NICHOLS <br /> Parent Permit: Owner: EVERGREEN MANOR <br /> Parent Project: Contractor: MILNE ELECTRIC INC <br /> Details: <br /> 240-volt,single phase temporary services <br /> 1,400amp temp servc for job site. 1,200amp servc for trlrs <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 5/13/2022 5/13/2022 ELEC 01-TEMP STEVE BANKS CORRECTION 400 amp <br /> SERVICE REQUIRED <br /> Notes: <br /> 5/11/2022 2:47 PM MILNE ELECTRIC INC <br /> 400-amp service is on west side of Summit Ave.The 200-amp service is located on the East side of Summit Ave. <br /> Contact Name:MILNE ELECTRIC INC <br /> Site Address:2612 SUMMIT AVE <br /> Phone:4254870870 <br /> e-Mail:russ.nichols@milneelectric.com <br /> (5/13/2022 9:34 AM SKB) <br /> Install a grounding electrode conductor from the electrode to the 200 amp disconnect grounded bus.Install a main bonding screw.install breaker <br /> tiedown on the trailer mean that is Back fed <br /> 5/13/2022 5/13/2022 ELEC 01-TEMP STEVE BANKS PARTIAL <br /> SERVICE APPROVAL <br /> Notes: <br /> OK 200 amp temporary service with cord drops and job trailer. <br /> 5/17/2022 5/17/2022 ELEC 10-FINAL STEVE BANKS CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 5/16/2022 12:55 PM MILNE ELECTRIC INC <br /> Re inspection on the 400-amp service <br /> Contact Name:MILNE ELECTRIC INC <br /> Site Address:2612 SUMMIT AVE <br /> Phone:4254870870 <br /> e-Mail:russ.nichols@milneelectric.com <br /> (5/17/2022 11:27 AM SKB) <br /> Each service disconnect must have a grounded electrode conductor terminated on it's grounded bus.install the main bonding screw in the the 200 amp <br /> disconnect. <br /> I <br /> Printed: Friday, 20 October, 2023 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.