Gildroy Project – Side wall infill schedule <br /> .-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-., <br /> air gap <br /> South Wall ! <br /> SoutH Face New structure <br /> No Infill required ! <br /> South;Wall ! <br /> North Face ! <br /> No infill required <br /> Existing garage 2"x4" Framing <br /> '. 5/8"Type X <br /> i <br /> Exterior Gypsum <br /> North Wall ' Sheathing <br /> South Face ' <br /> 1hr fire-rated assembly required 1"x2" Furring* <br /> ! Install 5/8"exterior gyp sheathing Type X to studs <br /> Exterior sheathing surface primed and painted <br /> '. 5/16" HardiePanel* <br /> ! North Wall <br /> North Face <br /> ' 1hr fire-rated assembly required 1-hr Fire-rated wall assembly with exterior cover <br /> Install 5/8"exterior gyp sheathing Type X to studs ! <br /> Install 1"x2" Hailers(furring)over studs will be applied to North Side of North Wall. <br /> Install Hardipanel siding to nailers(creating air gap) ! <br /> Exterior siding surface primed and painted ; * The South Side of the North Wall will receive <br /> only gypsum sheathing (furring and siding <br /> omitted). Surface will be painted. <br /> Not to scale N m—r- <br /> L.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-._ <br />