Laserfiche WebLink
Gildroy Project — Side wall infill schedule <br />.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-., <br />South Wall <br />SoutH Face New structure <br />No Infill required <br />South; Wall <br />North, Face <br />No infill required <br />Existing garage <br />i <br />i <br />North Wall <br />South Face ' <br />1hr fire -rated assembly required <br />! Install 5/8" exterior gyp sheathing Type X to studs <br />Exterior sheathing surface primed and painted <br />! North Wall <br />North Face <br />1hr fire -rated assembly required <br />Install 5/8" exterior gyp sheathing Type X to studs ! <br />Install 1"x2" nailers (furring) over studs <br />Install Hardipanel siding to nailers (creating air gap) <br />Exterior siding surface primed and painted <br />Not to scale N m—r- <br />L.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-._ <br />%" air gap <br />2"x4" Framini <br />5/8" Type X <br />Exterior Gypsun <br />Sheathing <br />11x2" Furring* <br />.Ji 16" HardiePanel <br />1-hr Fire -rated wall assembly with exterior cover <br />will be applied to North Side of North Wall. <br />* The South Side of the North Wall will receive <br />only gypsum sheathing (furring and siding <br />omitted). Surface will be painted. <br />