My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2118 VIRGINIA AVE 2023-10-23
>
Address Records
>
VIRGINIA AVE
>
2118
>
2118 VIRGINIA AVE 2023-10-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 11:39:20 AM
Creation date
10/20/2023 11:12:19 AM
Metadata
Fields
Template:
Address Document
Street Name
VIRGINIA AVE
Street Number
2118
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • • Habitat <br /> for Humanity' <br /> of Snohomish County <br /> HFHSC CONTRUCTION DEPT— Gildroy • - adjustment <br /> Customer/Contractor: Bob and Vivian Gildroy <br /> Project Address: 2118 Virginia Ave, Everett WA <br /> Permit#132008-025 <br /> Permit#: B2008-025 <br /> SiOe Address: 2118 VIRGINIA AVE <br /> Owner: GILDROY ROBERT A&VIVIANI <br /> Tenant (Ten Namel <br /> App.Date: 8/14/2020 <br /> Proposed Use: SFR <br /> Desviptan: REPLACE CANOPY THAT WAS DESTROYED <br /> BY SNOW FEB 2019 <br /> Reviewed By:_ Date: 2' <br /> _Office Set X ,Ob Site Set _Rre/Planning 6t <br /> Dear Everett Planning, <br /> Habitat for Humanity of Snohomish Co. is assisting the Gildroys in building the permitted structure. <br /> During the initial construction the six piers supporting the structure were located,formed-up, inspected, <br /> and poured. <br /> After pouring the piers builders realized the E piers were located at slab corner as drawn. But, because <br /> the required 7' W setback, placing the E foundation piers at the slab corners resulted in the overall <br /> building length almost 4' shorter than required by the plans. <br /> Our solution is to add two new piers E of the existing installed piers (See photos).This will extend the <br /> structure to the full planned distance of 20'10". We will excavate and form the piers, and call for <br /> inspection. If passing, the piers will be poured and construction will continue as planned and approved. <br /> We're sharing this minor change to ensure it's documented in the planning file. If there are questions or <br /> comments to be addressed, please contact me anytime. <br /> Thank/you. <br /> Christian Anderson <br /> Construction Manager <br /> Habitat for Humanity of Snohomish Co <br /> canderson@habitatsnohomish.org <br /> (425) 922-2066 <br /> HFHSC Construction Dept—Home Repair Service 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.