Laserfiche WebLink
Permit Inspections <br /> E V E R E T T City of Everett <br /> WASH INGTON <br /> 5/24/2022 5/24/2022 BLDG 08-FRAMING KURT KECK CORRECTION <br /> REQUIRED <br /> Notes: <br /> 6/29/2022 6/29/2022 BLDG 08-FRAMING KURT KECK CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 7/19/2022 7/19/2022 BLDG 08-FRAMING RAKEEB KHAN CANCELLED eTRAKiT Inspection Request <br /> Notes: <br /> 7/20/2022 7/20/2022 BLDG 08-FRAMING KURT KECK APPROVAL OK to sheet rock mud and tape <br /> Notes: <br /> 9/9/2022 9/9/2022 BLDG 16-FINAL KURT KECK NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 1.Complete plumbing mechanical and electrical inspections2.Reschedule for building final when ready <br /> 9/15/2022 9/15/2022 BLDG 16-FINAL KURT KECK APPRVD-PERMIT eTRAKiT Inspection Request <br /> FINAL <br /> Notes: <br /> 9/13/2022 4:51 PM Jiayi Shen <br /> Contact Name:Jiayi Shen <br /> Site Address:2308 TAYLOR DR <br /> Phone:4255315919 <br /> e-Mail:jiayi.shen@hotmail.com <br /> 47 <br /> Printed: Friday, 16 September,2022 2 of 2 SUPERION <br />