My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2431 BROADWAY MONEY TREE 2018-01-02 MF Import
>
Address Records
>
BROADWAY
>
2431
>
MONEY TREE
>
2431 BROADWAY MONEY TREE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 2:58:41 PM
Creation date
10/20/2023 2:51:22 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2431
Tenant Name
MONEY TREE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Although this is a smaller project, the schedule of special inspections is referenced by our inspectors after the <br />building permit is issued, and reviewed for completion before the certificate of occupancy is re�eased. <br />Meg <br />_.__ _ _ . _ _ <br />From: Aaron Newell mailto:anewellCa�dci-engineers.com <br />Sent: Wednesday, December 22, 2010 3:03 PM <br />To: Meg Haley <br />Cc: Jce Sfoy <br />Subject: RE: Schedule of special inspections for the Money Tree Store #6 in Everett, permit number BI010-045 <br />Do you have a template you use there in Everett? If not I will ask around to see if someone in the office has one. <br />Aaron D. Newell, P.E. <br />Structurai Projecl Engineer - DCI Engineers, Spokane <br />P�. 509-455-4448 • anewel�dci-enyine_ers.com <br />From: Meg Haley Lailto:MHaleya�ci.ev_erett.wa.us <br />Sent: Wednesday, December 22, 2030 3:00 PM <br />To: Aaron Newell <br />Cc: ]oe Stoy <br />Subject: RE: Schedule oF special inspections for the Money Tree Store #6 fn Everett, permit number B1010-045 <br />Hi Aaron, <br />I was hoping that you could provide us a schedule or summary of special inspections required, as we <br />discussed on the phone, including the frequency of observation required. <br />We should have asked for this during pian review, but now we need it for inspection. We typically receive this <br />as part of the permit submittal, and ir we don't, we ask for it on a corrections letter. <br />Thanks, <br />Meg <br />_ --- - - _--- _ _ ____ — ------- <br />From: Aaron Newell (mailto:anewelle�dci-engineers.coml <br />Sent: Wednesday, December 22, 2010 2:57 PM <br />To: Meg Haley <br />Cc: Joe Stoy <br />Subject: RE: Schedule of special inspections for the Money Tree Store #6 in Everett, permit number B1010-045 <br />Meg, <br />There is minor structural steel and deck on this project at the canopy so that is why that is in the general notes. Also the <br />concrete is designed as a 2500psi mix bui specified as 3000psi for quality, sinm it is designed as 2500psi there are no <br />special inspections required for the concrete (reference sheet 51.2 "Table of Mix Design Requirements" note 9). <br />Aaron D. Newell, P.E. <br />SlrucWral Project Engineer- DCI Engineers, Spokane <br />P: 509-455-0448 • anewell@dci-enaineers.com <br />�2/3) <br />
The URL can be used to link to this page
Your browser does not support the video tag.