My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1615 LOMBARD AVE 2023-10-31
>
Address Records
>
LOMBARD AVE
>
1615
>
1615 LOMBARD AVE 2023-10-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:46:27 AM
Creation date
10/23/2023 1:46:54 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
1615
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (20)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (400W) <br /> (20)ENPHASE <br /> IQ8PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:8.000 kWDC <br /> ,N SOLAR BONDING CONNECTION GROUND PATHS " ■ .;; SM SOLAR ENDCLAMP, FIRST MODULE : ■ AC SYSTEM SIZE:6.000kWAC <br /> ■� MOUNT INSTALLATION GUIDE PAGE ■■ MOUNT INSTALLATION GUIDE PAGE <br /> - <br /> ------_-------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- <br /> REVISIONS <br /> /1 Aro t HGE�� O © © DESCRIPTION DATE REV <br /> i <br /> yOOGCFFq OG�FF�MF © gpP S�Q�SEOF�' �/r.' All <br /> B \ pRE �je0 OoaDtHG T BO ..�-. <br /> ONO/NCT GapPO� � Oj ra <br /> al - BoU . tpl_ � \ 0do Mir <br /> PROJECT NAME&ADDRESS <br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAILTO L-FOOTw/BONDING T-BOLT INSTALL MODULE END CLAMPS:The End INSTALL END CLAMPS ON RAIL: POSITION END CLAMPS: NOTE:To assist insertion of clamp into Q <br /> Bonding Hardware creates bond between sola, Serrated flange no removes L foot anodirahon clamp is supplied as an assembly with a 1/2' Slide end clamp on to rail by Slide end clamp assembly rail slot,Pressure may be applied to (n <br /> ®Aluminum mid clamp with stainless steel bonding pins that pierce module frame Q bar and each rad seem ©to bond L-Foot to stamtess steel T-bolt <br /> anodization to bond module to module through clamp hex head bolt that is accessible at the ends of engaging the two t-guide brackets on to rail until bolt head top or side of bracket as shown.Do <br /> y�Aluminum spike <br /> ba+spans across rail gap to Serrated T-bolt head nd L-fo t ail unodiaation <br /> V create rad to rail bond.Rail on at least one 5de grounded rails.The clamp should be installed on the with the top slot of the rails. engages with end of rail not force clamp into rail by pushing <br /> Stainless steel nut bonds aluminum clamp to stainless sleet T-bolt of splice wdl W vended m bond Loop nut,and L-loot to <br /> gr SM raiz rails prior to installing end modules. boU is extended as far as possiule End clamps are positioned on on bolt with excessive force. O <br /> Serrated T-bolt head penetrates fail amortization to bond T-bolt,nut,clamp,and - so that clamp is positioned at max, rails prior to the first end N <br /> modules to SM rail distance from end of raiL module and prior to the Last 00 <br /> end module. Q o <br /> C:) <br /> It D E o <br /> hrx lfuT wf rAlrNl > - yI 2—► 1ya O <br /> � a-- <br /> WCx waslR.R - - OE. ♦ 1 , CD <br /> — - BONDING , acs o'°g a o h� r • ' W <br /> r co <br /> T-BOLT caSJ gkigF sm" � .a 0. U M <br /> E A D g z>v 1 z W N <br /> •Sn1iN BONDING BONDING RAIL � -- 1 �'\ Q > CO <br /> OUND MICROINVERTER SPLICE BA0. "©' <br /> ' ♦ tT <br /> MOUNT - - - <br /> / o <br /> U) W <br /> / - W /® <br /> EEBLUG(OR ILSCO LUG) = W W o <br /> IFSR' O Q <br /> BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND INSTALL FIRST MODULE: ENGAGE CLAMP:While holding module in position and with _ Q z <br /> [�Hex not with Capt"lock washer bonds metal (�WEEB washer dimples pierce anodlred fait to Install the first end module flange in full contact with rail,rotate end clamp bolt until For best appearance, <br /> II 4 microinverter mange to stainless steel T-toll `-a create bond between rail and lugposition module flush <br /> BONDING MiDCLAMP onto rails with the flange of clamp engages with flange to provide clamp force. with ends of rails.Rails Q Q <br /> 4 SerratedT-bolt head penetrates ail—duction <br /> ASSEMBLY - — Solid copper wine conneeteoto Iug,sroutedto the module frame positioned To ensure bolt is not over-torqued,use low torque setting should not extend more m <br /> to Dord T-Dolt-nut and L-loot to grounded <br /> AJC sed wlt-,..,-,,,,,.,, ;,,,. „l ©p odde trial system ground connection. between end clamps an ends on drill or If using an impact driver,stop rotation as soon as �s than 1R-beyond module. <br /> nwu_, Vir su.—un®f,m.n,n ter- :lc..:��Wn.r.�ce, ,nr.:e:-,law 1 Module must be fully <br /> l" - RAILTO LFOOr aapgw.a m,rrnlrwarep.s�wrr.'w ry.rlu menwofmter.-ie.nT+s arta of rails. impact action of driver begins. supported by rails and <br /> -WAONPINGT-BOLT -iii�IUE VALUE(See t.. �. :'.•; �,1�-:0� '. � cannot overhang ends O <br /> J <br /> End clamp bolt to 5 ft-lbs.No anti-seize of rails. Lf) <br /> CC) <br /> r <br /> DATE: 10/22/2022 <br /> SHEET NAME <br /> EQUIPMENT <br /> LSPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.