My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
215 79TH PL SW 2023-10-31
>
Address Records
>
79TH PL SW
>
215
>
215 79TH PL SW 2023-10-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 9:56:41 AM
Creation date
10/23/2023 1:57:57 PM
Metadata
Fields
Template:
Address Document
Street Name
79TH PL SW
Street Number
215
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (24)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (400W) <br /> (24)ENPHASE <br /> IQ8PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:9.600 kWDC <br /> ,N SOLAR BONDING CONNECTION GROUND PATHS " ■ .;; SM SOLAR ENDCLAMP, FIRST MODULE : ■ AC SYSTEM SIZE:7.200kWAC <br /> ■� MOUNT INSTALLATION GUIDE PAGE ■■ MOUNT INSTALLATION GUIDE PAGE <br /> - <br /> ------_-------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- <br /> REVISIONS <br /> 4 Aro t HGF�\� O © © DESCRIPTION DATE REV <br /> 11 <br /> 0.1le <br /> L <br /> '1100'. <br /> O 0oa0tHG T BO ..� <br /> ONO/NCT c'J r G\''pPO� � Oj ra <br /> do Idomw <br /> PROJECT NAME&ADDRESS <br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAILTO L-FOOTw/BONDING T-BOLT INSTALL MODULE END CLAMPS:The End INSTALL END CLAMPS ON RAIL: POSITION END CLAMPS: NOTE:To assist insertion of clamp ince <br /> Bonding Hardware creates bond between Splice ©serrated flange no removes L foot anodiration clamp is supplied as an assembly with a 1/2' Slide end clamp on to rail by Slide end clamp assembly rail slot,Pressure may be applied to <br /> ®Aluminum mid clamp with stainless steel bonding pins that pierce module frame Q bar and each rad section to bond L-Foot to stainless steel T-bon Q <br /> anodization to bond module to module through clamp hex head bolt that is accessible at the ends of engaging the two t-guide brackets on to rail until bolt head top or side of bracket as shown.Do () <br /> Aluminum spll<e ba+spans across rail gap to h Serrated T-bott head nd L-fo t ail unodization <br /> V create rail to rail bond.Rail on at least one Side c!m bora r.bat.nut.aro L-root m grounded rails.The clamp should be installed on the with the top slot of the rails. engages with end of rail tial force clamp into rail by pushi:u• <br /> Stainless steel nut bonds aluminum clamp to stainless steel T-bolt a splice lam W grounded gr <br /> gr SM raiz rails prior to installing end modules. boU is extended as far as possiule End clamps are positioned on on bolt with excessive force <br /> Serrated T-bolt head penetrates fail anodization to bond T-bolt,nut,clamp,and - so that clamp is positioned at max, rails prior to the first end cl <br /> modules to SM rail CD <br /> distance from end of rail. module and prior to the Last N NN <br /> end module. 00 <br /> Z:) Cn CD <br /> CD <br /> E W Q N <br /> D Nut All ii <br /> —► {{ Y O <br /> WCx wasl.R - - OE. <br /> 4— - a-- BONDING ' acs o'°g a o r ' W W O <br /> r T-BOLT PtF�F I - AwigF SVTs` .a a. m U O <br /> E D g \>✓F z W cD <br /> W rn <br /> •Sn1iN BONDING BONDING RAIL 1 �' <br /> MICR INVERTER SPLICE BA0. ©' _ <br /> OUND ,C) W <br /> ♦ 00 <br /> MOUNT U) w Q <br /> / — WEEBLUG(OR ILSCO LUG) W W (] <br /> IF 1/1' — <br /> BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND INSTALL FIRST MODULE: ENGAGE CLAMP:While holding module in position and with U) Z <br /> [ Hex no with Capt"tock washer bonds metal (�WEEB washer dimples pierce anodized fait to Install the first end module flange in full contact with rail,rotate end clamp bolt until For best appearance, <br /> II 4 microinverter flange to stainless steet T-toll `-a create bond between rail and lugposition module flush J 0- <br /> Serrated T-Wt heat penetrates it anoduation <br /> BONDING MiDCLAMv onto rails with the flange of clamp engages with flange to provide clamp force. with ends of rails.Rails Q <br /> 4 a <br /> ASSEMBLY - — to Doro T-Dolt-nuL and L-loot to grounded Solid copper mreconneaedto lug isromedto the module frame positioned To ensure bolt is not over-torqued,use low torque setting should not extend more = T_A yt,a;l .,_ ,,. ,,, „l ©provide firm system ground connection. between end clamps an ends on drill or If using an impact driver,stop rotation as soon as �s than 1/2.beyond module. (� <br /> awi,ms,�.ryr,en.neu un®f,--ink ter- :lc..:�q,,,n.L.z ce, ,nr.:e:-,law 1 Module must be fully <br /> diN ����.- e.nT+s lata of rails. impact action of driver begins. i Cy)RAILTO LFOOaovrw.d"'Ine Rn"or,.Ww", iiiyal <br /> T - supported by fails and <br /> _WAOIOlNGT-BOLT "9'4 ,-iii uUE VALUE(See t. :'.•; �,C. cannot overhang ends <br /> End clamp bolt to 5 ft-lbs.No anti-seize of rails. L17 <br /> N <br /> DATE: 10/28/2022 <br /> SHEET NAME <br /> EQUIPMENT <br /> LSPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.