Laserfiche WebLink
SCOPE OF WORK GOVERNING CODES SYSTEM RATING PHOTOVOLTAIC SYSTEM FIRE <br /> TO INSTALL A ROOF MOUNTED SOLAR PHOTOVOLTAIC SYSTEM AT THE OWNER RESIDENCE CLASSIFICATION LISTING IN 600 kVVDC 7. Lumio <br /> LOCATED AT 1909 MCDOUGALL AVE, EVERETT, WA 98201, USA. 2020 NATIONAL ELECTRICAL CODE ACCORDANCE WITH UL 1703 <br /> THE POWER GENERATED BY THE PV SYSTEM WILL BE INTERCONNECTED WITH THE UTILITY 2018 INTERNATIONAL FIRE CODE 5.700 kWAC STANDARD. <br /> GRID THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT. 2018 INTERNATIONAL BUILDING CODE SMART ENERGYTODAY <br /> THE PV SYSTEM DOES NOT INCLUDE STORAGE BATTERIES. 2018 INTERNATIONAL RESIDENTIAL CODE SHEET INDEX 1550 DIGITAL DR,LEHI,UT <br /> WASHINGTON ADMINISTRATIVE CODE (WAC) PV1 COVER PAGE 84043,USA <br /> EQUIPMENT SUMMARY AHJ NAME : CITY OF EVERETT PV2 SITE PLAN <br /> 19 Q CELLS Q.PEAK DUO BLK ML-G10+ (400W) MODULES WIRING AND CONDUIT NOTES PV3 ROOF PLAN <br /> 19 ENPHASE IQ8PLUS-72-2-US (240V) MICROINVERTERS • ALL CONDUIT SIZES AND TYPES SHALL BE LISTED FOR ITS PURPOSE AND PV4 STRING LAYOUT&BOM <br /> APPROVAL FOR THE SITE APPLICATIONS <br /> GENERAL NOTES - ALL <br /> ATTACHMENT DETAILS <br /> CABLING <br /> • THESE CONSTRUCTION DOCUMENTS HAVE BEEN BASED ON FIELD INSPECTIONS AND ALL PV CABLES AND WIRES BE#1 ,USE 2, PV WIRE, OR PV7 ELECTRICAL LINE&CALCS. <br /> OTHER INFORMATION AVAILABLE AT THE TIME. ACTUAL FIELD CONDITIONS MAY REQUIRE PROPRIETARY SOLAR CABLING SPECIFIED BYYAWG MFR, OR EQUIVALENT; ROUTED TO SYSTEM INFO <br /> MODIFICATIONS IN CONSTRUCTION DETAILS. SOURCE CIRCUIT COMBINER BOXES AS REQUIRED PV8 SPECIFICATIONS&NOTES <br /> (19)Q CELLS <br /> . ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT SHALL BE PV9-PV10 SIGNAGE Q.PEAK DUO BILK ML-G10+ <br /> • ARCHITECT HAS NOT BEEN RETAINED TO SUPERVISE ANY CONSTRUCTION OR DERATED ACCORDING TO AS PER LATEST NEC CODE. (40OW) <br /> INSTALLATION OF ANY EQUIPMENT AT SITE. JOB SAFETY PLAN <br /> EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE-2, 90'C RATED, WET AND UV (1S)ENPHASE <br /> • CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TOOLS, OBTAINS ALL RESISTANT,AND UL LISTED RATED FOR 600V, UV RATED SPIRAL WRAP SHALL BE [EE�� EQUIPMENT SPECIFICATIONS Q8STEMLUS SI-2-US(0 kW <br /> PERMITS, LICENSES AND PAY ALL REQUIRED FEES AND COMPLETE INSTALLATION. USED TO PROTECT WIRE FROM SHARP EDGES DC SYSTEM SIZE:7.600 kW <br /> • CONTRACTOR HAS THE FULL RESPONSIBILITY TO CHECK AND VERIFY ALL DIMENSIONS . PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED THHN/THWN-2 PROJECT SITE AC SYSTEM SIZE:5.700 kWAC <br /> AND EXISTING CONDITIONS. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER INSULATED, 90°C RATED, WET AND UV RESISTANT, RATED FOR 1000V AS PER _y <br /> BEFORE PROCEEDING WITH THE WORK. ANY WORK STARTED BEFORE CONSULTATION AND APPLICABLE NEC <br /> ACCEPTANCE BY THE ENGINEER SHALL BE THE SOLE RESPONSIBILITY OF THE <br /> CONTRACTOR AND SHALL BE SUBJECT TO CORRECTION BY THEM WITHOUT ADDITIONAL • 4-WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH THE HIGHER REVISIONS <br /> COMPENSATION. VOLTAGE TO GROUND MARKED ORANGE OR IDENTIFIED BY OTHER EFFECTIVE <br /> DESCRIPTION I DATE REV <br /> • DAMAGE CAUSED TO THE EXISTING STRUCTURE, PIPES, DUCTS, WINDOWS, WALL, FLOORS, MEANS ` <br /> ETC. SHALL BE REPAIRED TO THE ORIGINAL CONDITION OR REPLACED BY THE ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE CIRCUIT PROTECTION <br /> CONTRACTOR AT NO ADDITIONAL COST. . VOLTAGE DROP LIMITED TO 2% <br /> • THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE PROPER INSTALLATION AND . AC CONDUCTORS>4AWG COLOR CODED OR MARKED: PHASE A OR L1- BLACK, <br /> COMPLETION OF THE WORK WITH APPROVED MATERIALS. PHASE B OR L2- RED, PHASE C OR L3- BLUE, NEUTRAL-WHITE/GRAY <br /> • NO CHANGES ARE TO BE MADE WITHOUT THE CONSULTATION AND APPROVAL OF THE . VOLTAGE DROP LIMITED TO 2% PROJECT NAME&ADDRESS <br /> ARCHITECT. . AC CONDUCTORS>4AWG COLOR CODED OR MARKED: PHASE AOR L1-BLACK, Q <br /> • CONTRACTOR SHALL OBTAIN BULDING PERMIT. NO WORK TO START UNLESS BUILDING PHASE B OR L2- RED, PHASE C OR L3- BLUE, NEUTRAL-WHITE/GRAY — U) <br /> PERMIT IS PROPERLY DISPLAYED. <br /> • ALL WORKMANSHIP AND MATERIALS SHALL BE OF FIRST QUALITY AND IN COMPLIANCE o <br /> WITH THE REQUIREMENTS OF THE FLORIDA BUILDING CODE, THE DEPARTMENT OF N <br /> ENVIRONMENTAL PROTECTION AND ALL PERTINENT AGENCIES. 00 <br /> rn <br /> • IT 1 S ESSENTIAL THAT ALL WORK PROCEED WITH THE MAXIMUM COOPERATION OF ALL Q <br /> PARTIES AND WITH MINIMUM INTERFERENCE TO THE OCCUPANTS WITHIN THE BUILDING. CD <br /> THE OWNER'S DIRECTIONS IN THIS REGARD SHALL BE FULLY COMPLIED WITH. ra oLO <br /> • ALL EXPOSED PLUMBING, HVAC, ELECTRICAL DUCTWORK, PIPING AND CONDUITS ARE TO _ _ zz uJ W o <br /> BE PAINTED BY GENERAL CONTRACTOR. I P.1:, cata Terms of Use Re ort a ma error � eo <br /> • THE CONTRACTOR SHALL PERFORM THE WORK IN STRICT CONFORMANCE WITH THE Q U LLI cy) <br /> LOCAL LAWS, REGULATIONS AND THE NATIONAL ELECTRIC CODE. HOUSE PHOTO SCALE:NTS Q W > <br /> M <br /> • •bVille <br /> THE CONTRACTOR SHALL OBTAIN ALL PERMITS, APPROVALS, AFFIDAVITS, CERTIFICATIONS, PROJECT SITEIvIdl0 <br /> ETC.AND PAY ALL FEES AS REQUIRED BY THE LOCAL AUTHORITIES. W W j o <br /> • CONTRACTORS SHALL OBTAIN FIRE CERTIF. UPON COMPLETION OF WORK. W Q <br /> Priest Point zz <br /> ELECTRICAL NOTES < Q <br /> • ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION. .0 D <br /> • ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90 DEGREE C WET p 0 <br /> ENVIRONMENT. U <br /> • WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLYN. NORTI T <br /> TO,AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. 6 EVE I O <br /> • WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL W � <br /> COMPLY WITH NEC 110.26. <br /> • WHERE SIZES OF JUNCTION BOXES, RACEWAYS,AND CONDUITS ARE NOT SPECIFIED, THE Q BAYSIDE S DATE:9/30/2022 <br /> CONTRACTOR SHALL SIZE THEM ACCORDINGLY. Everett <br /> SHEET NAME <br /> • ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. PORT GARDNER COVER PAGE <br /> • MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE <br /> SUPPORT RAIL, PER THE GROUNDING CLIP MANUFACTURERS INSTRUCTION. <br /> • MODULE SUPPORT RAIL SHALL BE BONDED TO THE MODULE SHEET SIZE <br /> GLACIER VIEW Fobes ANSI B <br /> Er <br /> C701v1c Leta Terms of use Report a ma error 11" X 17" <br /> VICINITY MAP SCALE:NTS <br /> SHEET NUMBER <br /> PV-1 <br />