Laserfiche WebLink
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (19)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (40OW) <br /> (19)ENPHASE <br /> IQ8PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:7.600 kWDC <br /> ,N SOLAR BONDING CONNECTION GROUND PATHS " ■ .;; SM SOLAR ENDCLAMP, FIRST MODULE : ■ AC SYSTEM SIZE:5.700kWAC <br /> ■� MOUNT INSTALLATION GUIDE PAGE ■■ MOUNT INSTALLATION GUIDE PAGE <br /> - <br /> ------_-------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- <br /> REVISIONS <br /> /1 Mo t HGE�� O © © DESCRIPTION DATE REV <br /> i <br /> 110.1lrAq-� OG(FF,4gMF © gpP S�RPrSS-OFA N 1 tel.' All <br /> B \ PRE �'e0 OoaDtHG Teo ..�-. <br /> ONO/NCT GNpPO� � Oj rado Mir <br /> al - BoU . tpl_ � \ 0 PROJECT NAME&ADDRESS <br /> _ Q <br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAILTO L-FOOTw/BONDING T-BOLT INSTALL MODULE END CLAMPS:The End INSTALL END CLAMPS ON RAIL: POSITION END CLAMPS: NOTE:To assist insertion of clamp into (n <br /> Bonding Hardware creates bond between sol,c, Serrated flange no removes Lfoot enodim— clamp is supplied as an assembly with a 1/2' Slide end clamp on to rail by Slide end clamp assembly rail slot,Pressure may be applied to <br /> ®Aluminum mid clamp with stainless steel bonding pins that pierce module frame Q bar and each rad section ©to bond LFoot to stainless steel T-bol[ <br /> anodization to bond module to module through clamp hex head bolt that is accessible at the ends of engaging the two t-guide brackets on to rail until bolt head top or side Of bracket as shown.Do <br /> y�Aluminum splice ba+spans across rail gap to Serrated T-bolt head penetrates ail anodization <br /> V create 11.1 to rail bond.Rail on at least one Side grounded rails.The clamp should be installed on the with the top slat of the rails. engages with end of rail not force clamp into rail by pushing O <br /> Stainless steel nut bonds aluminum clamp to stainless steel T-bolt m bond T-bolt nut.and L-foot to <br /> of spill,wdt be grounded SM rail rails prior to installing end modules. bott is extended as far as possiule End clamps are positioned on on bolt with excessive force. N <br /> Serrated T-bolt head penetrates fail anodization to bond T-bott nut,clamp,and - so that clamp is positioned at max, rails prior to the first end 00 <br /> modules to SM rail O <br /> distance from end of rail module and prior to the last Q> <br /> end module. > O <br /> O <br /> - E o <br /> .. D uuT wf rairtve > Q s, _. _ 2�► ''{{ Z <br /> loraw 11R - - Or. , O O <br /> 4 a-- c— - BOHbIHG Ja � a o 1 1 LU W L0 <br /> w oMo <br /> T.BOLr ce.F - _ AwigF a��.. 1 �a a Q z <br /> U Leo` 1 J uJ pip <br /> SYS7U1 BONDING RAIL 1 <br /> OUND MGIC OI NVERTER SPLICE BAR C 0 w co <br /> ♦ MOUNTLj <br /> / - WEEBLUG(OR ILSCO LUG) ® W w < O <br /> INSTALL FIRST MODULE: ENGAGE CLAMP:While holding module in position and with LLj J <br /> BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND 9 P � J z <br /> 4[ Hes mit with captrw'tockwasherDWWsmetal (�Wlwasher dimples pierceanodltedfait to Install the first end module flange in full contact with rail,rotate end clamp bolt until For best appearance, <br /> microinverter flange to stainless steel T-boll `-a create bond between rad aw luqposition module Rush Q 0- <br /> BONDING MiDCLAMv onto rails with the flange of clamp engages with flange to provide clamp force. with ends of rails.Rails (D Q <br /> ASSEMBLY - — 4 toporkSerrated T-bult head penetrates ail—d-ti-to orbT-boltnutand L-foot togrourMed solid c© upper mam <br /> wine lug is routed the module frame positioned To ensure bolt is not over-torqued,use low torque setting should not extend more D <br /> A ,C SM w;l-,..,-,,,,,.,, ;,,,. „l provide ruin system ground connection. between end clamps an ends on drill or If using an impact driver,stop rotation as soon as �s than 1/2.beyond module. O <br /> 1 Module must be fully <br /> of rails. impact <br /> RAILTOL-FOOr aapgor.a rMnnlrwarta.,.nr.%�r+riNNrimpactaction Of driver begins. <br /> supported by rails and <br /> w/80-tIQlNG 7-BOLT "9'4 -iii uUE VALUE(See t. :..; �;,C- Cannot overhang ends (� <br /> End clamp bolt to 5 ft-lbs.No anti-seize of rails. <br /> C3) <br /> O <br /> CY) <br /> r <br /> DATE:9/30/2022 <br /> F SHEET NAME <br /> EQUIPMENT <br /> LSPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-19 <br />