Laserfiche WebLink
Installation - EJOT Solar Fastening System - <br /> New installation: <br /> Steps 1 to 3 are omitted. Start of the installation process with step 4. <br /> Re-fitting: <br /> If the EJOT Solar Fastening System is to be installed on an existing roof, the installation process will start with step 1. <br /> 1.Taking out existing 2. Removing sealing washer 3. Cleaning from dust <br /> fastener <br /> • <br /> Installation process <br /> Metal profiles Fiber cement profiles <br /> (aluminium/steel) <br /> profiles:4. Pre-drilling <br /> Steel <br /> profilePre-drill 0 in substructure <br /> Pre-drill 0 in steel <br /> Pre-drillFiber cement profiles: <br /> o in fiber cement profile <br /> below>Pre-drill 0 in substructure! <br /> Please refer to the pre-drill diameters <br /> at the chart <br /> Pre-drilling diameter in mm for pro- Thickness of the substructure: <br /> filed metal sheets and substructure <br /> ®� <br /> EJOT Solar Fastening System Recommended pre-drilling diameter in metal profiles: <br /> 0®® <br /> Pre-drilling diameter in the profiled metal sheets= Pre-drilling diameter in the substructure <br /> The pre-drilling diameter in roofings with fiber cement profiles always has to be bigger than the diameter of the <br /> EJOT Solar Fastening System! <br /> The pre-drilling diameter in the substructure corresponds to the indications from the table above. <br /> EJOT Solar Fastening System Pre-drilling diameter in fiber cement profiles <br /> : 0 <br /> 0.0 <br /> EJOT®The Quality Connection <br /> 4 <br />