Laserfiche WebLink
STEP 1. <br />DETERMINE APPLICABILITY <br />Use the criteria below to determine if this template may be used for your project. If any <br />criteria below are marked "False," this template may not be used and a report meeting <br />City standards is required and shall be prepared by a professional Engineer licensed in the <br />State of Washington. Flow control facilities shall be designed by an engineer for projects <br />with_2,000 sf or more net new impervious area (see Step 6). <br />V <br />This project will create at least 2,000 ft2 of new plus replaced impervious <br />surface area or at least 200 sf of net new impervious area. <br />This project will create less than 5,000 ft2 of new plus replaced impervious <br />surface area. <br />This project drains to the combined sewer. <br />This project converts less than 3/4 acre of existing soil cover or vegetation to <br />lawn or landscape areas. <br />This project will not adversely impact a water of the state. <br />This project will not change a natural drainage course and will not generate any <br />new concentrated flows leaving the site. <br />This project will not be constructed within a critical area or a critical area buffer <br />and will not adversely impact a critical area. See the City of Everett: Municipal <br />Code, Title 19.37. <br />C11,Y (,w EVERETT <br />RE <br />VIEWED) FOR t--P ."!T <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in <br />the Combined Sewer Area -April 2021 <br />Cj -T-V r,r :._ �r'C?�T <br />R EV i L:... <br />3 <br />