Laserfiche WebLink
STEP 4. COMPLETE MINIMUM REQUIREMENTS <br />The more information provided in these subsections typically corresponds to faster review and permit <br />issuance times. Submitted checklists that lack the necessary information for review are considered <br />incomplete and will be returned unprocessed to the applicant. <br />Preparation of Stormwater Site Plan <br />The purpose ofthis task is to conveyall relevant information aboutthe proposed projectto the City for review <br />to ensure the project is in compliance with the current City and State stormwater management standards. <br />This is your opportunity to inform the reviewer about the project fundamentals as well as highlight the <br />significant and insignificant aspects of the project with regards to stormwater management. <br />Task 1: Describe existing site conditions <br />1 <br />Provide description o existing site conditions:VV\ L t L) L u <br />Describe existing structures (location, type): <br />S0 V-V-\ J2, <br />J <br />Describe slopes on your site (flat, rolling, steep, %): <br />Describe hard surfaces (roof, ground treatment): A <br />K 0 0-�- )0 <br />e q-A- <br />10 <br />Describe vegetative surfaces (location, quantity ft2): <br />c� <br />r< <t <br />tt t <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in <br />the Combined Sewer Area -April 2021 <br />L4 �- <br />12- <br />w�1 <br />R <br />