My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
431 ALVERSON BLVD 2024-01-03
>
Address Records
>
ALVERSON BLVD
>
431
>
431 ALVERSON BLVD 2024-01-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 8:17:38 AM
Creation date
10/24/2023 1:31:15 PM
Metadata
Fields
Template:
Address Document
Street Name
ALVERSON BLVD
Street Number
431
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N/A <br />COMPLETE IF USING INFILTRATION (2A or 213) TO MEET FLOW <br />CONTROL REQUIREMENT <br />Determine whether infiltration has been pre -determined to be infeasible for any portion of your <br />project site. <br />■ Review the infiltration infeasibility mapping tool available on "Map Everett" <br />. everettwa.gov/mapeverett. <br />■ On the mappingtool, select"Geotechnical/Infiltration Infeasibility Area" and the <br />applicable "Property" layers from the Layer List. <br />■ Zoom into your project site and print the resulting map to show the project site <br />boundaries and the infiltration infeasibility mapping results. <br />■ Areas mapped as red have been pre -determined to be infeasible for infiltration. <br />■ Areas mapped as green are potentially feasible for infiltration and must be <br />assessed further for infiltration feasibility, as discussed further below. <br />40 ■ Attach a printed copy of the map clearly showing your project site boundary and the <br />infiltration infeasibility mapping results. <br />* If you selected Downspout Full Infiltration (2A), submit I and 2 below. <br />If you selected Rain Garden/Bioretention (2113), on -site soils information for sizing is <br />required from I through 3 below. <br />Submit the following information to Permit Services with this report: <br />. A USDA Custom Soil Report from https://websoilsurvey.sc.e-zov.usda..zov <br />2. USDA Soil Type(s)= <br />3. Measured Infiltration Rate = <br />in/hr, measured at BMP location on -site. Use Rain. Garden <br />Handbook methodology for infiltration test. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in 20 <br />the Combined Sewer Area -April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.