Laserfiche WebLink
2021 Stormwater System Development Fee Calculations <br />Permit #: B2108-011 <br />Additional Notes: <br />Project Address: 431 ALVERSON BLVD <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: SORIANO ADDITION <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Prepared By: ABIY TSEGAYE Date: 8/30/2021 <br />Outside City Limits? No *Adds a 25% Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />lReviewed By: Date: ti4 13t f 14-L t <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit #: B2108-011 Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />519 SF <br />Stormwater System Dev Fee: <br />$136.65 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />Permit #: PWXXXX-XXX Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />I SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />• <br />:7 <br />