My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4815 BAKER DR 2023-10-25
>
Address Records
>
BAKER DR
>
4815
>
4815 BAKER DR 2023-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 8:25:18 AM
Creation date
10/25/2023 7:00:50 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER DR
Street Number
4815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 2 P0 Washington(� State Energy Code Residential <br /> Prescriptive Energy Code Compliance for All Climate Zones in Washington <br /> Single Family ''New &Additions (effective February 1,2021) Version 1.0 <br /> These requirements apply to all IRC building types, including detached one- and two-family <br /> dwellings and multiple single-family dwellings (townhouses). <br /> Project Information Contact Information <br /> Brickley Rsidence Jonathan Brandt 1122 NE 75th St Seattle,WA 98115 <br /> 4815 Baker Drive Everett,WA 98203 206-601-8637 jb@jbarch.net <br /> Instructions. This single-family project will use the requirements of the Prescriptive Path below and <br /> incorporate the minimum values listed. Based on the size of the structure, the appropriate number of <br /> additional credits are checked as chosen by the permit applicant. <br /> Provide all information from the following tables as building permit drawings. Table R402.1 - Insulation and <br /> Fenestration Requirements by Component,Table R406.2 - Fuel Normalization Credits and 406.3-Energy Credits, <br /> Authorized R epresentative Jonathan Brandt Digitally signed by Jonathan Brandt <br /> Date:2021.07.30 12:36:33-07'00' D 07/30/2021 <br /> ate <br /> All Climate Zones (Table R402.1.1) <br /> R-Value a U-Factor a <br /> Fenestration U-Factor b n/a 0.30 <br /> Skylight U-Factor b n/a 0.50 <br /> Glazed Fenestration SHGC b,e n/a n/a <br /> Ceiling e 49 0.026 <br /> Wood Frame Wall "'" 21 int 0.056 <br /> Floor 30 0.029 <br /> Below Grade Wall c.b 10/15/21 int+TB 0.042 <br /> Slab "R-Value & Depth 10, 2 ft n/a <br /> R-values are minimums. U-factors and SHGC are maximums.When insulation is installed in a cavity that is less <br /> a than the label or design thickness of the insulation,the compressed R-value of the insulation from Appendix <br /> Table A101.4 shall not be less than the R-value specified in the table. <br /> b The fenestration U-factor column excludes skylights. <br /> "10/15/21 +STB means R-10 continuous insulation on the exterior of the wall, or R-15 continuous insulation on <br /> the interior of the wall, or R-21 cavity insulation plus a thermal break between the slab and the basement wall at <br /> c the interior of the basement wall. 10/15/21 +STB shall be permitted to be met with R-13 cavity insulation on <br /> the interior of the basement wall plus R-5 continuous insulation on the interior or exterior of the wall. "SIB" <br /> means R-5 thermal break between floor slab and basement wall. <br /> d R-10 continuous insulation is required under heated slab on grade floors. See Section R402.2.9.1. <br /> For single rafter- or joist-vaultedceilings,the insulation may be reduced to R-38 if the full insulation depth <br /> e <br /> extends over the top plate of the exterior wall. <br /> R-7.5 continuous insulation installed over an existing slab is deemed to be equivalent to the required perimeter <br /> f slab insulation when applied to existing slabs complying with Section R503.1.1. If foam plastic is used, it shall <br /> meet the requirements for thermal barriers protecting foam plastics. <br /> For log structures developed in compliance with Standard ICC 400, log walls shall meet the requirements for <br /> g climate zone 5 of ICC 400. <br /> Int. (intermediate framing) denotes framing and insulation as described in Section A103.2.2 including standard <br /> h framing 16 inches on center, 78%of the wall cavity insulated and headers insulated with a minimum of R-10 <br /> insulation. <br /> ...,, a u <br /> ...6r..---:4, 70.E0YE1 <br /> DEC 0 3 2021 _ AUG 2 7 2021 <br /> CITY OFEVERETT <br /> CITY OF EVF P. FACT Permit Services , <br /> Prescriptive Path—Single Family Pe20111BiWasinrlgtf evatate Energy Code-R 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.