My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4815 BAKER DR 2023-10-25
>
Address Records
>
BAKER DR
>
4815
>
4815 BAKER DR 2023-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 8:25:18 AM
Creation date
10/25/2023 7:00:50 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER DR
Street Number
4815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Inspections <br />VERETT City of Everett <br />WAAHINATON <br />1/29/2022 <br />1/28/20Z2 BLDG W-EUERIOR <br />RAKEEB KHAN <br />APPROVAL <br />See notes <br />HEAR <br />Notes. <br />1/26/202210:23 AM Tom Zivyon <br />Contact Name: Tom Byrnes <br />Site Address: 4815 BAKER DR <br />Phone: 20629AJ8B <br />e-Mail: usainvoice2lgagmail.rvm <br />(1/28/2022 3:26 PM RFK) <br />Exterior shear OK. Informed contractor about still needing CS strap on red far shear transfer. See structural detall on plans. <br />2/11/2022 <br />2/11/2022 <br />BLDG 08-FRAMING <br />KU RT KECK <br />CANCELLED <br />cancelled by contractor <br />Notes: <br />2/10/2022 8A0 AM Tom ZlWon <br />Contact Name: Tom Zivyon <br />Site Address: 0815 BAKER DR <br />Phone: 2062574788 <br />e-Mail: usainvoice2lusgmad.com <br />2/17/2022 <br />2/17/2022 <br />BLDG 08FRAMING <br />RAKEEB KHAN <br />CORRECTION <br />REQUIRED <br />Notes: <br />2/16/20221:22 PM Tom Zivyon <br />Contact Name: Tom Avyon <br />Site Address: 0915 BAKER DR <br />Phone: 2062574788 <br />e-Mail: usainvoice2l@gmail.rom <br />(2/17/20221:19 PM RFK) <br />Called PM and informed them to apply for plumbing and electrical permits. No plans on site.lab set required on site. Bottom ofjoists under 18"to <br />exposed ground In crawl space. Provide 18" or P.T.joists Call for plumbing and electrical inspections before framing Inspection. <br />4/11/2022 4/11/2022 <br />BLDG DB-FRAMING <br />KURT KECK <br />CORRECTION <br />See notes <br />REQUIRED <br />Notes: <br />0/6/20223:17 PM Tom Zmycn <br />Contact Name: Tom ZiWon <br />Site Address: 0915 BAKER DR <br />Phone : 2N25747M <br />e-Mail: usainvoice2llignvid.com <br />(4/11/20223:26 PM KMO <br />1.Obtain mechanical permit for hood vent In kitchen and inspections <br />2.It appears that the roof ridge vent is not venting, fix. <br />3. Remove all subfloor in area of work and Install vapor barrier on ground. <br />4. Reschedule for underfloor Dancing Inspection after both things In p3 are completed. <br />ip1 <br />Printed: Wednesday, 275ptember, 2023 2of6 sDPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.