My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4815 BAKER DR 2023-10-25
>
Address Records
>
BAKER DR
>
4815
>
4815 BAKER DR 2023-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 8:25:18 AM
Creation date
10/25/2023 7:00:50 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER DR
Street Number
4815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Inspections <br />VERETT City of Everett <br />WARIHINATMIN <br />4/28/2022 <br />4/28/2022 <br />BLDG 12 <br />KURT KECK <br />PARTIAL <br />wall and ceiling except hood area <br />INSULATION <br />APPROVAL <br />Notes. <br />4/27/2022 5:05 PM USA GREEN BUILDERS CORPORATION <br />Contact Name: USA GREEN BUILDERS CORPORATION (Brendt Butler( <br />Site Address: 4815 BAKER DR <br />Phone: 4256152422 <br />¢-Mail: USAGREENRIJUDEFLO GMAILCOM <br />(4/28/20221:26 PM KMK) <br />Walls and ceiling as m sheet rock except Leave hood vent area open for mechanical inspector. <br />5/3/2022 <br />5/3/2022 <br />BLDG 16-FINAL <br />KURT KECK <br />NOT READY <br />See notes <br />Notes: <br />512:55 PM USA GREEN BUILDERS CORPORATION <br />Contact Name: USA GREEN BUILDERS CORPORATION <br />Site Address: 4815 BAKER DR <br />Pbone:4256152422 <br />¢-Mail: USAGREENBUBDEROGMAILCOM <br />(5/3/ID22 7:55 AM KMK( <br />Obtain finals on all sub permits to include plumbing, mechanical, and electoral. <br />Reschedule for building Mal when ready. <br />8/4/2022 <br />8/5/2022 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />CORRECTION <br />See notes <br />REQUIRED <br />Notes: <br />Inspection completed On 814/2022: <br />Provide strap between tap plate connecting existing and new wall tap plate at the location of the new beam. <br />Interior shear wall not ready. No shear Or holdowns. Contactor suggested another exterior wall as potential shear wall. Engineer to provide <br />calculation and letter. <br />Drawings specify trussed roof but currently stick framed which Inluded some cedar rakers. The framing Is net within the prescriptive limitations Of <br />the IRC and Engineer to provitle letter and calculations to confirm mn4mRion or provitle alternative fix. <br />Beam reduced at ends. Engineer to provide letter for tapered beam. <br />Strap an top of roof sheathing at mearwall to new beam. See prodouscorrectlons. <br />Provide insulation baffle. <br />loirt hanger nailing into existing framing. <br />12/2/2022 <br />12/2/2022 <br />BLDG 07EXTERIOR <br />gAKEEB KHAN <br />CORRECTION <br />SHEAR <br />REQUIRED <br />Notes: <br />Special inspection report required for post Installed holdown anchors <br />12/3/2022 <br />12/2/3022 <br />BLDG 08-FMMIN5 <br />RAREER KHAN <br />CORRECTION <br />REQUIRED <br />Notes: <br />Fireproof all penetration$. Engineerto verify ske-bullttruss connections are acceptable. Mending plates uAld ratherthan TP37 plate and calling per <br />plans. To mmai engineerto discuss. <br />i g1 <br />Printed: Wednesday, DSep[ember, 2023 4of6 SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.