My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4815 BAKER DR 2023-10-25
>
Address Records
>
BAKER DR
>
4815
>
4815 BAKER DR 2023-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 8:25:18 AM
Creation date
10/25/2023 7:00:50 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER DR
Street Number
4815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Inspections <br />VERETT City of Everett <br />WASHINGTON <br />Permit Number: P2203-039 <br />Applie& 3/29/2022 Approved: 3/29/2022 <br />Issued: 3/29/2022 Finaled: 7/12/2023 <br />Status: FINALED <br />Parent Permit B21054138 <br />Parent Project <br />Description: replace kit drain <br />Site Address: 015 BAKER DR <br />City, State Zip Code: EVERETT, WA 98203 <br />Applicant: DEREK HENRY <br />Owner BRICKLEY LLYNN C <br />Contractor PINKY'S PLUMBING LLC <br />Details: <br />rough in kitchen sink drain, install properly sited pipe with proper drain &fNngs <br />replace kit drain <br />UST OF INSPECIFION <br />SCHEDULED DATE COMPLETED DATE TYPE <br />INSPECTOR RESULT REMARKS <br />4/4/2022 <br />4/4/2022 <br />PLUMB ON ROUGH <br />BILLY APPLETON <br />APPROVAL <br />eTRAKiT Inspection Request <br />Notes: <br />4/1/2022 12:04 PM PINKY'S PLUMBING LLC <br />Contact Name: PINKY'S PLUMBING LLC <br />Site Address: 4815 BAKER DR <br />Phone: 2067071497 <br />e- Mail: customersericeirpinkysplumbing.biz <br />(4/4/202211:00 AM BGA) <br />Lunched bump out, tied into adding 2" line In cowl. <br />8/4/2022 <br />8/4/2022 <br />PLUMB08-FINAL <br />1A50N <br />CORRECTION <br />MORRISSEY <br />REQUIRED <br />Notes: <br />- Install airgap for Dishwasher drain per UPC. <br />-Install dual angle stop on has supply under kitchen sink per UPC all FlMures require there own shut off. <br />- Install hammer arrester for supply to dishwasher per UPC. <br />6/16/2023 <br />6/16/2023 <br />PLUMB 08-FINAL <br />1A50N <br />CORRECTION <br />see notes <br />MORRISSEY <br />REQUIRED <br />Notes: <br />BRIAN 425-343-3844 <br />Correction copied from previous correction on 8/4/22. Install airgap for Dishwasher drain per UPC. 807.3 Demesne Dishwashing Machine"" No <br />domestic dishwashing machine shall be directly connected to a drainage system orfood waste disposer without the use of an approved dishwasher air <br />gap fining on the discharge side of the dishwashing machine. Listed air gaps shall be installed with the flood level (FLI marking m or above the Rood <br />level of the sink or drainboard, whichever is higher.Install hammer arrester for supply to dishwasher per UPC. 609.10 Water Hammer"^ Building <br />water supply systems where quick -acting valves are Installed shall he provided with water hammer arrestedsl to absorb high pressures resulting from <br />the quick closing of these valves. Water hammer arresters shall be approved mechanical devices that comply with ASSE 1010 or PER WH 201 and shall <br />be installed as close as possible to quick -acting valves: Install approved ptrap rifting per the UPC from disposal discharge to trap arm. Per the UPC <br />1003.1 General Requirements -Only one slip Joint fitting can be on downstream side of in trap per the UPC 1003.2 Slip Joint Fittings <br />i <br />Printed: Wednesday, 12 July, 2023 1 of 2 k <br />SVPEPION <br />
The URL can be used to link to this page
Your browser does not support the video tag.