Laserfiche WebLink
PUBLIC WORKS PERMIT <br />Date Applied: <br />6/14/2023 <br />City of Everett Permit Services <br />Public Works Permit#: <br />PW2306-012 <br />3200 Cedar street, 2n° Floor <br />Associated Bldg Permit#: <br />EVERETT <br />Everett, WA 98201 <br />Planning Reference#: <br />everettwa.eov/permits <br />Public Works Fee: <br />$65.00 <br />WASHINGTON <br />Perm itSeryices9eye rettwa.eoy <br />Schedule Inspections Ed onlineoermits.everettwa.eov <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />IMRANS MARKET II LLC Faag Qureshi <br />9602 EVERGREEN WAY 2619 SEATTLE HILL RD <br />EVERETT, WA 98204-7140 MILL CREEK, WA 98012 <br />PHONE: PHONE: 2063548237 <br />SITE ADDRESS: 9602 EVERGREEN WAY TAX PARCEL ID#: MW2WMD700 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: GRIND AND OVERLAY EXISTING PARKING LOT AREA WITH RESFRIPING TO MATCH EXISTING MARKINGS <br />PERMIT CONDITIONS: <br />1. All inspections shall be scheduled online at bttos//onlineoermioneverettwa.eov. Available inspection dates are shown in the dropdown menu. <br />2. All work shall be performed in accordance with the permit and current Gain of EverettDesign and Construction Standards and Specifations for <br />Development. <br />3. Call Location underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 911. <br />4. Site Gall Work to he done per plans approved by the City of Everett Public Works Department. Approved plans must remain on jobsit at all times. <br />S. Inspections are required for all stages of construction. Visit the Ciys Online Permitting Postal a onlinepermits.everettwa.gov to formally request all <br />required Inspections. <br />6. Instal and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspectorand the approved <br />SWPPP/TESC Plan. Remove upon completion of the project pnorto final approval of the permit. <br />T. Keep Christreets dean at all times. No din, had, rocks, or debris W he tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. Any damage to Gay improvements didewulk,curb,roadway, Are) shall be replaced per City Standards and/or as directed by the City PW Inspector. <br />30. It is the applicant/owner's responsibility to ensure that rtormwater cousin from new/replaced impervious surfaces will be managed on -site in <br />manner that does not adversely affect neighboring properties, Including the City's right-of-way and/or easement and the improvements located <br />therein. <br />11. Prior to any interruption is the public right-sf-way(roadways, parking lanes, or sidewalks)a Traffic Street Use permit shall be obtained from the <br />Ci ys Traffic Engineering Division. This permit an be applied for online at onainepermureveretiwagov and requires a traffic control plan to be <br />submitted for the area of requested closure. Please allow 1-2 weeks for TSU Permit Issuance from the date of application. <br />12. This permit must be fnaled in order to close am this permit/grant a Cannanore ofOccupancy. Request a final inspection online byrehearing Par 25- <br />Site final/permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items haw been completed. <br />13, All work constructed within the public right of way must to removed or relocated at the owner's expense if the City ever requires use of the right. <br />of -way for municipal purposes. <br />PERMIT FEE BREAKDOWN: <br />Misc. Minor Permits (Striping) ..........................................$25.00 <br />PW Plan Review ... ..... ..... ................................................... <br />$20.00 <br />PW Site Inspection .... ..... ................................................... <br />$20.00 <br />By Purchasing this permit and commencing work, the owner/applicant hereby agrees to hold and save harm less the City of Everett from any and <br />all doIam for damages, costs, expenses, or causes of action that may arise because of Installation and maintenance of the improvement or other <br />right-of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged <br />thereby. <br />VALIDITY/EXPIRATION: <br />Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion. <br />This permit may be canceled by the city upon any stoppage of work on this project over 18oday duration. Each inspection extends the expiration <br />date 180 days to keep the permM1 open while work is active. <br />Page 1 of 1 <br />_APPLICANI SITE COPY _ADDRESS FILE _TREASURER <br />