Laserfiche WebLink
2022 Stormwater System Development Fee Calculations <br />Permit M B2112-052 <br />Additional Notes: <br />Project Address: 1101 Grande Ave <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name.. Wertheimer Residence (2 Story Addition) <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Prepared By: Abiy Tsegaye Date: 4/8/2022 <br />Outside City Limits? No *Adds a 25%Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />lReviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit #: B2112-052 Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />327 SF <br />Stormwater System Dev Fee: <br />$87.57 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />Permit #: PWXXXX-XXX Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />- I SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />• <br />1] <br />