Laserfiche WebLink
Methodology | Criteria <br />Methodology Based on:Used when: <br />Buy-in method The value of the existing system’s <br />capacity <br />Existing system has sufficient capacity to serve <br />new development now and in the future <br />Incremental cost method The value or cost to expand the <br />existing system’s capacity <br />Existing system has limited or no capacity to serve <br />new development now and into the future <br />Combined method Blended value of both the existing <br />and expanded system’s capacity <br />Some capacity is available in parts of the existing <br />system, but new capacity will need to be built in <br />other parts to serve new development at some <br />point in the future <br />•Fixed asset records <br />•Capital Improvement Plan (CIP) <br />•Construction Work in Progress (CWIP) <br />•Debt service credit <br />•Reserve balance <br />•Equivalent Residential Units (ERU)