My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
909 58TH PL SW 2023-10-26
>
Address Records
>
58TH PL SW
>
909
>
909 58TH PL SW 2023-10-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 1:40:37 PM
Creation date
10/26/2023 1:30:44 PM
Metadata
Fields
Template:
Address Document
Street Name
58TH PL SW
Street Number
909
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />; SFM SYSTEM BONDING & GROUNDING �s � EN <br />Sol SUN B�� <br />800.377.4480 <br />M1403 N. Research Way <br />M MICRORAIL'" INSTALLATION GUIDE � PA E <br />Star Washer is <br />Single Use Only <br />TERMINALTORQUE, <br />Install Conductor and <br />torque to the followir <br />4-6 AWCr. 35in-lbs <br />8 AWG: 25 in-lbs <br />10-14 AWG: 20 in-lbs <br />TERMINAL TORQUE, <br />Install Conductor and <br />torque to the following: <br />4-14 AWG: 35in-lbs <br />WEEBLUG <br />Single Use Only <br />i$5 <br />TERMINAL TORQUE, <br />Install Conductor and <br />torque to the following: <br />6-14 AWG: 711-lbs <br />LUG DETAIL & TORQUE INFO LUG DETAIL, & TORQUE INFO LUG DETAIL & TORQUE INFO <br />Ilsco Lay -In Lug (GBLr4DBT) Ilsco Flange Lug (SGB-4) Wiley WEEBLug (6.7) <br />• 10-32 mounting hardware 0 1/4" mounting hardware 1/4" mounting hardware <br />• Torque = 5 ft-lb 0 Torque = 75 in -lb 9 Torque = 10 ft-lb <br />• AWG 4-14 - Solid or Stranded 0 AWG 4-14 - Solid or Stranded 0 AWG 6-14 - Solid or Stranded <br />NOTE: ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION <br />System bonding is accomplished through modules. System grounding accomplished by attaching <br />a ground lug to any module at a location on the module specified by the module manufacturer. <br />E W BONDING PATH: <br />E-W module to module bonding is accomplished <br />with 2 pre -installed bonding pins which engage <br />on the secure side of the MicrorailTM and splice. <br />method <br />N- S BONDING PATH: <br />N-S module to module bonding is <br />accomplished with bonding clamp with 2 integral <br />bonding pins. (refer also to alternate method) <br />Alternate method <br />TRIMRAIL BONDING PATH: <br />Trimrail to module bonding is accomplished with <br />bonding clamp with integral bonding pin and <br />bonding T-bolt. (refer also to alternate method) <br />CONFIDENTIAL- THE INFORMATION <br />HEREIN CONTAINED SHALL NOT BE <br />USED FOR THE BENEFIT OF ANYONE <br />EXCEPT BLUE RAVEN SOLAR NOR <br />SHALL IT BE DISCLOSED IN WHOLE OR <br />IN PART TO OTHERS OUTSIDE <br />RECIPIENTS ORGANIZATION, EXCEPT <br />IN CONNECTION WITH THE SALE AND <br />USE OF THE RESPECTIVE EQUIPMENT, <br />WITHOUT THE WRITTEN PERMISSION <br />OF BLUE RAVEN SOLAR LLC. <br />N�CE <br />CERTIFIED <br />PV INSTALLATION <br />PROFESSIONAL <br />Scott Gurney <br />#PV-011719-015866 <br />CONTRACTOR: <br />BRS FIELD OPS <br />385-498-6700 <br />DRAWING BY: <br />PLOT DATE: <br />PROJECT NUMBER: <br />SPEC SHEET <br />REVISION: I PAGE NUMBER: <br />SS <br />
The URL can be used to link to this page
Your browser does not support the video tag.