Laserfiche WebLink
EVERETT <br />WASHINGTON <br />PUBLICSfORKS PERMIT <br />City of Everett Permit Services <br />3200 Cedar Street, 2"d Floor <br />Everett, WA 98201 <br />425-257-8810 <br />ate Applied: <br />Orks <br />4/7/2022 <br />Public Permit M <br />PW2204-004 <br />Associated Bldg Permit #: <br />B2204-014&B2205-041 <br />Planning Reference #: <br />REV1122-033 <br />Public Works Fee: <br />$10,836.04 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />PORT OF EVERETT <br />BRANDON WHITAKER <br />PO BOX 538 <br />EVERETT, WA, 98206 <br />PHONE: 4252593164 <br />PHONE: 4255086627 <br />TAX PARCEL ID #: 29051800400500 <br />SITE ADDRESS: 1710 W MARINE VIEW DR <br />DESCRIPTION: SITEWORK FOR NEW COMM BLDGS (2) TO BE CONSTRUCTED. <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and Specifications for <br />Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans, SWPPP, and drainage report approved by the City of Everett Public Works Department dated 06/16/2021. <br />Approved plans must remain on job -site at all times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all required <br />inspections. A handout is provided at permit issuance with instructions on how to request an inspection online. <br />6. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW Inspector. <br />7. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense. This work to be under a <br />separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department. Work shall be scheduled 3-4 <br />weeks in advance. <br />8. As-builts of storm, sanitary sewer, and water systems will be required to be submitted to the PW Inspector per City Design and Construction <br />Standards and Specifications for Development prior to final approval/close out of the permit. <br />9. A 2-year Warranty Bond in the amount of 10% of the construction costs for all Stormwater Infrastructure shall be submitted to the City prior to <br />final approval/close out of the permit. <br />10. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. To schedule a planning inspection, <br />contact Planning@everettwa.gov and request an inspection with the permit number, site address, and inspection type listed. Please allow up to one <br />week for the inspection to be scheduled. <br />11. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained from the <br />City's Traffic Engineering Division. This permit can be applied for online at pw.everettwa.gov and requires a traffic control plan to be submitted for the <br />area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br />12. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting PW <br />25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests when all items v"en completed for this permit. <br />13. If the property is ever subdivided, each parcel will require their own water and sewer connection. r? <br />14. Recorded Declaration of Covenant for Stormwater BMP s required prior to final inspection. <br />Public Works Permit Fee Breakdown: <br />Erosion Control..............................................$200.00 <br />Grade/Fill/Excavate (800 CY) <br />.........................$190.00 <br />Paving 24 080SF 120.40 <br />PW Plan Reviewl >� <br />...........................................$1,292.34 <br />PW Site Inspection.......................................$2,584.68 PC�r,' <br />Stormwater System Development Fee ......... $6,448.62 <br />City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant <br />hereby agrees to hold and save harmless the City of Everett from any <br />and all claims for damages, costs, expenses, or causes of action that <br />may arise because of installation and maintenance of the <br />n �/ <br />l "�4 tTe7m" 06/2112022 improvement or other right-of-way use here to applied for and further <br />agrees to remove same upon notice from the City and to replace <br />Approved for Construction, Public Works Dept. Date public property damaged thereby. <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE <br />CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION. EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />_APPLICANT/JOB SITE COPY _TREASURER _ADDRESS FILE <br />