Laserfiche WebLink
Figure 11-3.4: Slope Installation <br />Notes: <br />1. Slope surface shall be smooth before placement for <br />proper soil contact. <br />2. Stapling pattern as per manufacturer's recommendations. <br />3. Do not stretch blanketslmattings tight - allow the rolls to <br />mold to any irregularities_ <br />4. For slopes less than 31-1:1 V, rolls may be placed in <br />horizontal strips. <br />5. If there is a berm at the top of the slope, anchor upslope <br />of the berm. <br />6. Lime, fertilize, and seed before installation, Planting of <br />shrubs, trees, etc. should occur after installation. <br />%w <br />DEPARTMENT OF <br />ECOLOGY <br />State of VVastlington <br />area, turn the end under 4" <br />and staple at 12" intervals <br />Slope Installation <br />NOT TO SCALE <br />Revised June 2016 <br />Please see http-'1Aw1ty.ecy wa.govloopyright.html for copyright notice including permissions, <br />limitation of liability, and disclaimer_ <br />2019 Stormwater Management Manual for Western Washington <br />Volume 11 - Chapter 3 - Page 297 <br />