My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1710 W MARINE VIEW DR 2024-01-03
>
Address Records
>
W MARINE VIEW DR
>
1710
>
1710 W MARINE VIEW DR 2024-01-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 9:12:13 AM
Creation date
10/26/2023 3:14:28 PM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1710
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
compliance with this BMP. <br />. Use vacuum street sweepers. <br />. Remove mud and other dirt promptly so it does not dry and then turn into dust. <br />. Techniques that can be used for unpaved roads and lots include: <br />• Lower speed limits. High vehicle speed increases the amount of dust stirred up from <br />unpaved roads and lots. <br />• Upgrade the road surface strength by improving particle size, shape, and mineral types <br />that make up the surface and base materials. <br />• Add surface gravel to reduce the source of dust emission. Limit the amount of fine <br />particles (those smaller than .075 mm) to 10 to 20 percent. <br />• Use geotextile fabrics to increase the strength of new roads or roads undergoing recon- <br />struction. <br />• Encourage the use of alternate, paved routes, if available. <br />• Apply chemical dust suppressants using the admix method, blending the product with <br />the top few inches of surface material. Suppressants may also be applied as surface <br />treatments. <br />• Limit dust -causing work on windy days. <br />• Pave unpaved permanent roads and other trafficked areas. <br />Maintenance Standards <br />Respray area as necessary to keep dust to a minimum. <br />BMP C150: Materials on Hand <br />Purpose <br />Keep quantities of erosion prevention and sediment control materials on the project site at all times <br />to be used for regular maintenance and emergency situations such as unexpected heavy rains. Hav- <br />ing these materials on -site reduces the time needed to replace existing or implement new BMPs <br />when inspections indicate that existing BMPs are not meeting the Construction SWPPP require- <br />ments. In addition, contractors can save money by buying some materials in bulk and storing them at <br />their office or yard. <br />Conditions of Use <br />Construction projects of any size or type can benefit from having materials on hand. A small <br />commercial development project could have a roll of plastic and some gravel available for <br />immediate protection of bare soil and temporary berm construction. A large earthwork project, <br />such as highway construction, might have several tons of straw, several rolls of plastic, flexible <br />2019 Stormwater Management Manual for Western Washington <br />Volume 11 - Chapter 3 - Page 314 <br />
The URL can be used to link to this page
Your browser does not support the video tag.