Laserfiche WebLink
Figure 11-3.28: Sediment Pond Plan View <br />Key divider into slope to <br />prevent flow around sides <br />The pond length shall <br />be 3 to 6 times the <br />maximum pond width <br />Iflow <br />Pond length <br />Silt fence or <br />equivalent divider <br />Note: Pond may be formed by berm or by partial or complete excavation <br />Emergency <br />overflow spilivmy <br />Discharge to stabilized <br />conveyance, outlet, or <br />level spreader <br />NOT TO SCALE <br />1 <br />Sediment Pond Plan View <br />Revised June 2016 <br />,OEPARTMENT OF <br />IECOLOGY <br />Please see http.lAwmi-ecy. wa.gOV/Copyr'ighf.html for copyright notice including permissions, <br />I State of Washington limitation of liability, and disclaimer. <br />2019 Stormwater Management Manual for Western Washington <br />Volume 11 - Chapter 3 - Page 392 <br />