Laserfiche WebLink
Table 3: Peak Discharge Summary <br />Return Period <br />2-year <br />10-year <br />25-year <br />100-year <br />Rational Method <br />Pre -Developed <br />Peak Discharge <br />(cfs) <br />NA <br />NA <br />2.66 <br />3.04 <br />Post Developed <br />Peak Discharge <br />(cfs) <br />NA <br />NA <br />2.21 <br />2.82 <br />MGS Flood <br />Pre -Developed <br />Peak Discharge <br />(cfs) <br />0.306 <br />0.479 <br />0.578 <br />5. PERMANENT STORMWATER CONTROL PLAN <br />Post Developed <br />Peak Discharge <br />(cfs) <br />0.293 <br />0.387 <br />0.553 <br />0.839 <br />The existing stormwater system serves the project site as well as the South Marina Parking lots and the <br />Lombardi's Parking lot. Refer to the Appendix C for a visual depiction of the conveyance system. This <br />conveyance system will be modified at the project site. The conveyance system will be analyzed as two <br />systems. The first system, A, is part of the proposed site improvements and collects the stormwater for the <br />project area. System A flows through a treatment vault on -site before discharging into system B. The second <br />system, B, collects runoff from the Port of Everett South Marina Parking Lot and other areas upstream of the <br />project limits. System B consists of existing pipes and catch basins as well as a new conveyance through the <br />project site. <br />The area contains multiple drainage sub -basins that collect in individual inlets that make up the site's existing <br />Port -owned conveyance system.. Drainage is routed to two outfalls north of the site. Outfall 1 is a 30" <br />diameter pipe and located south of Lombardi's restaurant approximately 160' north of the site. Outfall 2 is a <br />36" diameter pipe located approximately 400' north of the site at Guest Dock 2 in the Port of Everett Marina. <br />The PGL site contains multiple drainage subbasins: BO consists of all areas that drain to existing inlets and <br />system B, while Al-A7 drain to new inlets on the PGL site. Roof drains connect to system A at CB 10. <br />Runoff from basins Al-A7 and the roofs are treated in a single treatment vault on -site. All runoff is <br />combined at the north end of the site and connected to the Port -owned conveyance system and outfalls north <br />of the site. See Appendix C for drainage plan of the site. <br />6. OFFSITE ANALYSIS <br />The proposed project stormwater drainage system will connect to the existing south marina stormwater <br />drainage system. As such, the effects of the proposed development on the existing system need to be <br />analyzed. Additionally, the existing system needs to be analyzed to determine its effects on the proposed <br />design. A portion of the existing system will be replaced within the project, therefore and analysis of the <br />system upstream of this replacement is required. <br />6.1. UPSTREAM ANALYSIS <br />The existing conveyance collects runoff from the Port of Everett South Marina parking lot and connects <br />through the project limits to the marina outfalls. The existing conveyance pipe is located within the <br />proposed building footprint. The storm system will be rerouted using new storm drains and manholes <br />around the building and will reconnect to the existing conveyance on the northside of the site. The new <br />P I nN, F71) <br />