My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1710 W MARINE VIEW DR 2024-01-03
>
Address Records
>
W MARINE VIEW DR
>
1710
>
1710 W MARINE VIEW DR 2024-01-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 9:12:13 AM
Creation date
10/26/2023 3:14:28 PM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1710
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Information (1.0) <br />Project/Site Name: Port Gardner Landing Building <br />Street/Location: 181h & West Marin View Dr. <br />City: Everett State: WA Zip code: 98201 <br />Receiving waterbody: Puget Sound <br />Existing Conditions (1.1) <br />Total acreage (including support activities such as off -site equipment staging yards, material <br />storage areas, borrow areas). <br />Total acreage: 1.08 Acres <br />Disturbed acreage: 0.88 Acres <br />Existing structures: None (former site of Weyerhaueser Building) <br />Landscape topography: Developed as asphalt/ gravel parking lot <br />of site. <br />Drainage patterns: Existing closed underground conveyance system to outfalls north <br />Existing Vegetation: Some landscaped areas. <br />Critical Areas (wetlands, streams, high erosion risk, steep or difficult to stabilize slopes): <br />NA <br />List of known impairments for 303(d) listed or Total Maximum Daily Load (TMDL) for the <br />receiving waterbody: The downstream waterbody from the project site is the Snohomish River. <br />Ecology listed Category 5 — 303(d) impairments are listed in Appendix F. <br />Proposed Construction Activities (1.2) <br />Description of site development: New 5,000 commercial buildings with drive through and <br />parking with other site improvements including landscaping and utility work. <br />Description of construction activities : <br />Site preparation, demolition of exisiting pavement and utilites, grading, paving, and construction <br />of two new commercial buildings. <br />Description of site drainage including flow from and onto adjacent properties. Must be consistent <br />with Site Map in Appendix A: <br />The site contains multiple existing drainage subbasins: Al drains northwest off of the site, while <br />A2, A3, A4, and A5 drain to inlets on the site. All existing catch basins connect to a conveyance <br />system that drains to the north of the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.