My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1710 W MARINE VIEW DR 2024-01-03
>
Address Records
>
W MARINE VIEW DR
>
1710
>
1710 W MARINE VIEW DR 2024-01-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 9:12:13 AM
Creation date
10/26/2023 3:14:28 PM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1710
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 9: Control Pollutants (2.1.9) <br />The following pollutants are anticipated to be present on -site: <br />Table 1 — Pollutants <br />Pollutant (and source, if applicable) <br />Cement concrete materials and products <br />General site solid waste <br />Petroluem products and/or hazardous material from vehicles and construction equipment <br />All pollutants, including waste materials and demolition debris, shall be disposed in a manner <br />that does not contribute to stormwater contamination. The site shall be kept clean and <br />organized to prevent the buildup of debris. <br />Containments created from saw cutting and surfacing operations shall be properly disposed of <br />to prevent stormwater contamination. <br />List and describe BMPs: <br />Dust Control (BMP C140); Sawcutting and Surface Pollution Prevention (BMP C152); Concrete <br />Handling (BMP C151); Concrete Washout Area (BMP C154); Storm Drain Inlet Protection (COE <br />STD DWG 210) Installation Schedules: <br />(COE STD DWG 210) <br />Installation Schedules: Install BMPs prior to constructiona activities, as necessary for <br />demolition and clearing activities, and prior to concrete delivery. <br />Inspection and Maintenance plan: Install BMPs prior to construction activities, as necessary <br />for demolition and clearing activities, and prior to concrete delivery and work. <br />Responsible Staff: CESCL <br />Will maintenance, fueling, and/or repair of heavy equipment and vehicles occur on -site? <br />No <br />Will wheel wash or tire bath system BMPs be used during construction? <br />No <br />Will pH -modifying sources be present on -site? <br />
The URL can be used to link to this page
Your browser does not support the video tag.