Laserfiche WebLink
Element 12: Manage the Project (2.1.12) <br />The project will be managed based on the following principles: <br />• Projects will be phased to the maximum extent practicable and seasonal work limitations <br />will be taken into account. <br />Inspection and monitoring: <br />o Inspection, maintenance and repair of all BMPs will occur as needed to ensure <br />performance of their intended function. <br />o Site inspections and monitoring will be conducted in accordance with Special <br />Condition S4 of the CSWGP. Sampling locations are indicated on the Site Maa. <br />Sampling station(s) are located in accordance with applicable requirements of <br />the CSWGP. <br />• Maintain an updated SWPPP. <br />o The SWPPP will be updated, maintained, and implemented in accordance with <br />Special Conditions S3, S4, and S9 of the CSWGP. <br />As site work progresses the SWPPP will be modified routinely to reflect changing site <br />conditions. The SWPPP will be reviewed monthly to ensure the content is current. <br />Table 4 — Management <br />X <br />Design the project to fit the existing topography, soils, and drainage patterns <br />X <br />Emphasize erosion control rather than sediment control <br />X <br />Minimize the extent and duration of the area exposed <br />X <br />I Keep runoff velocities low <br />X <br />Retain sediment on -site <br />X <br />Thoroughly monitor site and maintain all ESC measures <br />Schedule major earthwork during the dry season <br />Other (please describe) <br />