My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1710 W MARINE VIEW DR 2024-01-03
>
Address Records
>
W MARINE VIEW DR
>
1710
>
1710 W MARINE VIEW DR 2024-01-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 9:12:13 AM
Creation date
10/26/2023 3:14:28 PM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1710
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reporting and Record Keeping (6.0) <br />Record Keeping (6.1) <br />Site Log Book (6.1.1) <br />A site log book will be maintained for all on -site construction activities and will include: <br />• A record of the implementation of the SWPPP and other permit requirements <br />• Site inspections <br />• Sample logs <br />Records Retention (6.1.2) <br />Records will be retained during the life of the project and for a minimum of three (3) years <br />following the termination of permit coverage in accordance with Special Condition S5.0 of the <br />CSWGP. <br />Permit documentation to be retained on -site: <br />• CSWGP <br />• Permit Coverage Letter <br />• SWPPP <br />• Site Log Book <br />Permit documentation will be provided within 14 days of receipt of a written request from <br />Ecology. A copy of the SWPPP or access to the SWPPP will be provided to the public when <br />requested in writing in accordance with Special Condition S5.G.2.b of the CSWGP. <br />Updating the SWPPP (6.1.3) <br />The SWPPP will be modified if: <br />Found ineffective in eliminating or significantly minimizing pollutants in stormwater <br />discharges from the site. <br />There is a change in design, construction, operation, or maintenance at the construction <br />site that has, or could have, a significant effect on the discharge of pollutants to waters <br />of the State. <br />The SWPPP will be modified within seven (7) days if inspection(s) or investigations) determine <br />additional or modified BMPs are necessary for compliance. An updated timeline for BMP <br />implementation will be prepared. <br />Reporting (6.2) <br />Discharge Monitoring Reports (6.2.1) <br />Cumulative soil disturbance is less than (1) acre therefore, Discharge Monitoring Reports <br />(DMRs) will not be submitted to Ecology monthly because water quality sampling is not being <br />conducted at the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.