Laserfiche WebLink
Table II-3.1: Construction Stormwater BMPs by SWPPP Element <br />(continued) <br />Construction Storm- <br />water BMP <br />Construction SWPPP Element # <br />#1 <br />#2 <br />#3 <br />#4 <br />#5 <br />#6 <br />#7 <br />#8 <br />#9 <br />#10 <br />#11 <br />#12 <br />#13 <br />BMP C 10T Con- <br />struction Road / Parking <br />Area Stabilization <br />BMP C120: Temporary <br />✓ <br />✓ <br />and Permanent Seeding <br />BMP C121: Mulching <br />BMP C122: Nets and <br />✓ <br />✓ <br />✓ <br />Blankets <br />BMP C123: Plastic <br />Covering <br />✓ <br />✓ <br />BMP C124: Sodding <br />BMP C125: Topsoiling / <br />✓ <br />Composting <br />BMP C 126: Poly- <br />acrylamide (PAM) for <br />Soil Erosion Protection <br />BMP C130: Surface <br />✓ <br />Vol' <br />Roughening <br />BMP C131: Gradient <br />✓ <br />✓ <br />Terraces <br />BMP C140: Dust Con- <br />✓ <br />trol <br />BMP C 150: Mater- <br />ials on Hand <br />BMP C 151: Concrete <br />✓ <br />Handlin <br />BMP C152: Sawcutting <br />and Surfacing Pollution <br />Prevention <br />BMP C153: Material <br />Delivery, Storage, and <br />Containment <br />2019 Stormwater Management Manual for Western Washington <br />Volume 11 - Chapter 3 - Page 268 <br />