Laserfiche WebLink
Table II-3.3: Stabilized <br />Construction Access <br />Alternative Material <br />Requirements <br />(continued) <br />Sieve Size <br />Percent Passing <br />2" <br />65-100 <br />3/e" <br />40-80 <br />No. 4 <br />5 max. <br />No. 100 <br />0-2 <br />% Fracture <br />75 min. <br />. All percentages are by weight. <br />. The sand equivalent value and dust ratio requirements do not apply. <br />. The fracture requirement shall beat least one fractured face and will apply the combined <br />aggregate retained on the No. 4 sieve in accordance with FOP for AASHTO T 335. <br />Maintenance Standards <br />Quarry spalls shall be added if the pad is no longer in accordance with the specifications. <br />If the access is not preventing sediment from being tracked onto pavement, then alternative <br />measures to keep the streets free of sediment shall be used. This may include replace- <br />ment/cleaning of the existing quarry spalls, street sweeping, an increase in the dimensions of <br />the access, or the installation of BMP C106: Wheel Wash. <br />Any sediment that is tracked onto pavement shall be removed by shoveling or street sweep- <br />ing. The sediment collected by sweeping shall be removed or stabilized on site. The pavement <br />shall not be cleaned by washing down the street, except when high efficiency sweeping is inef- <br />fective and there is a threat to public safety. If it is necessary to wash the streets, the con- <br />struction of a small sump to contain the wash water shall be considered. The sediment would <br />then be washed into the sump where it can be controlled. <br />Perform street sweeping by hand or with a high efficiency sweeper. Do not use a non -high effi- <br />ciency mechanical sweeper because this creates dust and throws soils into storm systems or <br />conveyance ditches. <br />. Any quarry spalls that are loosened from the pad, which end up on the roadway shall be <br />removed immediately. <br />. If vehicles are entering or exiting the site at points other than the construction access(es), <br />BMP C103: High -Visibility Fence shall be installed to control traffic. <br />2019 Stormwater Management Manual for Western Washington <br />Volume 11 - Chapter 3 - Page 277 <br />