Laserfiche WebLink
cu <br />roadsi <br />Notes <br />1. <br />2 <br />Figure II-3.1: Stabilized Construction Access <br />the requirements of the <br />permitting agency. <br />It is recommended that <br />the access be crowned <br />so that runoff drains off <br />the pad. <br />NOT TO SCALE <br />1. <br />Provide full width <br />of ingress/egress <br />area <br />l <br />f <br />0! Stabilized Construction Access ` <br />Revised June 2018 <br />DEPARTMENT OFF <br />ECOLOGY please see http /MowW.6Cy. w8.gcri/lco ight.hUM for copyright notice including permissions, <br />State of Washington limitation of liability. and disclaimer. <br />2019 Stormwater Management Manual for Western Washington <br />Volume 11 - Chapter 3 - Page 279 <br />