My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2504
>
Ordinances
>
Ordinance 2504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2023 3:08:13 PM
Creation date
10/27/2023 3:08:04 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2504
Date
8/14/1930
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> ORDINANCE NO. 2504 <br /> An Ordinance providing for the improvement of the west <br /> side of Broadway Avenue, from the Great Northern viaduct north <br /> to California Street, ,by the removal of and replacement of old <br /> curb and walk where settled and construction of new, two course, <br /> concrete walk and reinforced one course concrete walk extending <br /> to property line and doing all other work necessary to make a <br /> complete improvement, all in accordance with Resolution No. 3580 <br /> of the City of Everett; creating an assessment district; creating <br /> a local improvement district fund therefor; providing that all payment <br /> of the cost and expense of such improvement, with the , exception <br /> of Two hundred fifty dollars ( 250.00) to be paid by the City of <br /> Everett, be made by special assessment on the property in said <br /> district under the mode of payment by bonds. <br /> WHEREAS, by Resolution No. 3580 of the City of Everett, <br /> the City Council of Everett has declared its intention to order <br /> the improvement as above outlined and doing all other work neces— <br /> sary in connection therewith to make a complete improvement in <br /> accordance with plans and specifications prepared by the City <br /> Engineer; now, therefore, <br /> THE CITY OP EVERETT DOES ORAIN: <br /> Section 1: That the west side of Broadway, from the <br /> Great Northern viaduct north to California Street, be imprtp & <br /> by the removal of and replacement of old curb and ,walk mtiote <br /> settled and construction of new two-course concrete *41kaUd re- <br /> inforced one-course concrete walk extending to property.µline, <br /> and doing all other work on the entire district necessary to make <br /> a complete improvement,aceording to the plans and specifications <br /> prepared under the direction of the City Engineer, which plans <br /> and specifications are hereby adopted and approved, <br />
The URL can be used to link to this page
Your browser does not support the video tag.