My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/30/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/30/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 9:24:38 AM
Creation date
10/31/2023 9:24:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/30/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/17/2023
(Message)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Beverly Lake Water Quality Retrofit Division C - CONTRACT <br />CITY OF EVERETT, WASHINGTON <br />CONTRACT <br />*dated of last signature below <br />THIS CONTRACT is made and entered into this __*___ day of ____*________, 20_*_, by and between <br />the City of Everett, Washington, a municipal corporation existing under the laws of the State of <br />Washington (the “City”) and R.L. Alia Company, a Washington corporation (“Contractor”). <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to <br />furnish all labor, tools, materials, equipment, and supplies required to complete in a workmanlike <br />manner the work, improvements, and appurtenances in accordance with the Specifications and Plans <br />and all other Contract Documents entitled: “Beverly Lake Water Quality Retrofit” (the “Project”). <br />1.Contract Documents. This Contract is the written agreement signed between the City and Contractor <br />and includes Division C – CONTRACT, Division P - PROPOSAL, Division B – BID ITEM DESCRIPTIONS, Special <br />Provisions, Contract Plans, Standard Specifications, Standard Plans in effect as of the date Bids are <br />opened, Addenda, supplemental agreements, change orders, certifications and affidavits required by <br />this Contract and by law, and Federal requirements that apply to this Contract and Project, all of which <br />are referred to as the “Contract Documents” and all of which are hereby incorporated by reference. The <br />Contract Documents are as posted for the Project on Builder’s Exchange of Washington <br />(www.bxwa.com) as of the Bid Opening Date. The complete set of these posted documents as a single <br />pdf as of Bid Opening Date is maintained by the City Clerk’s Office and is available as follows: <br />Link to <br />PDF <br />https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=1588780&searchid=b96f9ca4- <br />89ba-4a1d-b432-4a75b6d90fc8&dbid=0&cr=1 <br />This is a 497-page pdf digitally signed by City of Everett 2023.10.17 09:04:58-07’00’ <br />(This pdf includes Contract Documents posted on BXWA as of Bid Opening Date. The pdf <br />does not include Contract Documents (such as WSDOT Standard Specifications) that were <br />not posted on BXWA.) <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to signing this <br />Contract. City and Contractor agree that this pdf contains all Contract Documents as of the Bid Opening <br />Date. City and Contractor further agree that this pdf may contain some other documents (such as <br />Reference Information) that are not Contract Documents. <br />2.Contract Time. Substantial completion shall be achieved within sixty-five (65) working days after the <br />effective date of the Notice to Proceed. Physical completion shall be within eighty (80) working days <br />after the actual date of issuance of substantial completion. <br />3.Liquidated Damages. The parties agree the City will suffer damage and be put to additional expense <br />in the event that the Contractor does not complete the work in all respects and have it ready for use by <br />the substantial completion date stated. Because it is difficult to accurately compute the amount of such <br />costs and damages, the Contractor hereby covenants and agrees to pay to the City liquidated damages <br />as computed in Section 1-08.9 of the Standard Specifications, as may be amended by the Special <br />Provisions, for each and every working day required to accomplish substantial completion of the work <br />in excess of the period established above for substantial completion. For overruns in contract time
The URL can be used to link to this page
Your browser does not support the video tag.