My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCRA Inc 10/27/2023 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BCRA Inc 10/27/2023 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:49:18 AM
Creation date
10/31/2023 10:48:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BCRA Inc
Approval Date
10/27/2023
Council Approval Date
10/11/2023
End Date
12/31/2026
Department
Parks
Department Project Manager
Lolly Huggins
Subject / Project Title
Parks Restrooms Renovation Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003723
Total Compensation
$240,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
BCRA Inc. 5/11/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
September 7, 2023 <br />Lolly Huggins <br />Capital Projects Coordinator <br />Everett Parks & Facilities <br />802 E. Mukilteo Blvd <br />Everett, WA 98203 <br />Sent VIA Email: lhuggins@everettwa.gov <br />RE: Everett Parks Restroom Renovation <br />Howarth Park, 1127 Olympic Blvd <br />ADDITIONAL SERVICE REQUEST #2 <br />BCRA Project No. 23007.00.00 <br />Dear Ms. Huggins: <br />BCRA is submitting this Additional Service Request to add structural engineering services to the project. <br />Description of Change <br />The TA Sullivan Park restroom renovation will involve removal of bearing walls, therefore structural <br />engineering services will be needed. PCS Structural Solutions will be providing these services. They will <br />perform structural analysis and provide structural calculations and drawings for building permit submittal. <br />They will also provide typical details for concrete curb of non-bearing wall for Forest Park and Legion Park <br />based on schematic design drawings. This proposal also includes construction administration services. Please <br />see the attached scope of services for more detail. <br />BCRA adds scope to coordinate with the structural engineer during information gathering and construction <br />document phase. <br />Additional Fees <br />Scope of Services Architecture Structural Engineering TOTAL <br />01 Information Gathering $1,280 $1,980 $3,260 <br />10 Schematic Design - $1,100 $1,100 <br />30 Construction Documents $1,920 $5,280 $7,200 <br />50 Construction Administration - $1,650 $1,650 <br />ASR #2 Total $3,200 $10,010 $13,210 <br />Subconsultant fees include a 10% administrative markup. This additional service is governed by our existing <br />City of Everett Professional Services Agreement, dated May 11, 2023.
The URL can be used to link to this page
Your browser does not support the video tag.