My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCRA Inc 10/27/2023 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BCRA Inc 10/27/2023 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:49:18 AM
Creation date
10/31/2023 10:48:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BCRA Inc
Approval Date
10/27/2023
Council Approval Date
10/11/2023
End Date
12/31/2026
Department
Parks
Department Project Manager
Lolly Huggins
Subject / Project Title
Parks Restrooms Renovation Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003723
Total Compensation
$240,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
BCRA Inc. 5/11/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />August 31, 2023 <br /> <br /> <br /> <br />BCRA Design <br />2106 Pacific Avenue, Suite 300 <br />Tacoma, WA 98402 <br /> <br />ATTN: Ming-Sing Ting <br /> <br /> <br />RE: Everett Park Restroom Renovations– Everett, Washington <br /> <br /> <br />Dear Ming-Sing: <br /> <br />Thank you for this opportunity to propose our Structural Engineering services for the Everett <br />Park Restrooms in Everett, Washington. There are three parks, which include TA Sullivan <br />Park, Legion Park and Forest Park. <br /> <br /> <br />SCOPE OF SERVICES <br /> <br />We would provide calculations and drawings to obtain a structural permit. Construction <br />administration is included in the services. <br /> <br />Our scope of services and resulting fees are based on the following: <br /> <br />• At TA Sullivan Park, a renovation of the single-story restroom will be done. At the <br />existing restroom, the existing masonry bearing wall will be removed and be <br />resupported with a new wood bearing wall. We will need to provide a site visit at this <br />location to validate beam sizes. <br />• At Legion Park and Forest Park, a new concrete curb will be installed at a non-bearing <br />wall. We will mark up your plans for these and provide a typical detail. No significant <br />structural engineering is anticipated for these projects that would require drawings and <br />calculations. <br />• We will provide Construction Administration services. No site visits are anticipated for <br />construction, but this can be added as an additional service. We will review shop <br />drawings and answer questions. We have assumed 8 hours of service. <br />• Trash Enclosures, lot lights, signage support, detention vaults, and other site <br />structures are not included but can be added as an additional service if requested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.