My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCRA Inc 10/27/2023 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BCRA Inc 10/27/2023 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:49:18 AM
Creation date
10/31/2023 10:48:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BCRA Inc
Approval Date
10/27/2023
Council Approval Date
10/11/2023
End Date
12/31/2026
Department
Parks
Department Project Manager
Lolly Huggins
Subject / Project Title
Parks Restrooms Renovation Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003723
Total Compensation
$240,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
BCRA Inc. 5/11/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
August 1, 2023 <br />Lolly Huggins <br />Capital Projects Coordinator <br />Everett Parks & Facilities <br />802 E. Mukilteo Blvd <br />Everett, WA 98203 <br />Sent VIA Email: lhuggins@everettwa.gov <br />RE: Everett Parks Restroom Renovation <br />Howarth Park, 1127 Olympic Blvd <br />ADDITIONAL SERVICE REQUEST #1 <br />BCRA Project No. 23007.00.00 <br />Dear Ms. Huggins: <br />BCRA is submitting this Additional Service Request due to changes in scope of the project. It does affect the <br />schedule and results in an increase in fee. <br />Description of Change <br />Per COE feedback on July 13, 2023, Howarth Park will move forward with a new restroom adjacent to the <br />existing restroom. Also, per email on July 25, 2023, COE decided not to remodel existing restroom into shelter <br />at this time. The additional scope is to carry Howarth Park schematic layout from schematic design phase to <br />the completion of the building. The scope of services includes architectural, structural, mechanical, electrical, <br />plumbing and cost estimates. The phases and schedule will be similar to the other three restrooms remodel, <br />which includes Phase 30 Construction Documents, Phase 40 Permitting, Phase 45 Bidding and Phase 50 <br />Construction Administration. The cost estimates will be provided at 60% and 100% of construction documents. <br />Please see attached scope of services for more details. <br />Additional Fees <br />Scope of Services <br />Architecture <br />Structural <br />Engineering <br />(PCS) <br />MEP (Design <br />West <br />Engineering) <br />Cost <br />Estimation <br />(Acker) <br />TOTAL <br />30 Construction Documents $17,500 $5,830 $6,575 $4,455 $34,360 <br />40 Permitting $2,580 - $820 - $3,400 <br />45 Bidding $1,680 - $820 - $2,500 <br />50 Construction Administration $7,400 $1,650 $2,110 - $11,160 <br />Sub-Total $29,160 $7,480 $10,325 $4,455 $51,420 <br />990 Reimbursable Expenses $300 - $100 - $400 <br />ASR #1 Total - - - - $51,820 <br />Subconsultant fees include a 10% administrative markup. This additional service is governed by our existing <br />City of Everett Professional Services Agreement, pending full execution as of August 1, 2023.
The URL can be used to link to this page
Your browser does not support the video tag.