Laserfiche WebLink
WPC — PHASES 2 AND 3 <br />STORMWATER BASIN MAP <br />Per 2017-POE HH Report for WPC <br />Phases 2 and 3 <br />\IIF <br />—_ —_ —_ <br />—__ <br />05 <br />n5 <br />33 AC <br />AZ of3 <br />I <br />1.14 A <br />n0 <br />0111 <br />am ocz <br />Ac <br />nz <br />4 <br />mz ce <br />m <br />ale Ac <br />cs <br />aA <br />y <br />y <br />\ <br />R <br />c21 <br />/ <br />o. Ac <br />9 <br />3 <br />oe0a <br />C44 <br />JI11 <br />C19 <br />0.n AC <br />0.92 AC <br />6 <br />D.W AC <br />B <br />O <br />i a Ac <br />AC <br />0u Ac <br />cs <br />r1 <br />�A <br />,.n Ac <br />aJl AC <br />aK � <br />/ <br />0.31 P91 M <br />1117 AC <br />RR <br />fJ <br />E6 <br />Iq AC <br />01g w <br />a44 Ac <br />la <br />o.m AC <br />01 <br />nJ <br />1.77 <br />a9 <br />0., <br />rig <br />NK (ViA <br />0.12K <br />v <br />n <br />O.IS AC <br />no f15 <br />014 AC D63 AC <br />f10 <br />O6eV <br />F17 <br />032 <br />fly <br />/ <br />n6 <br />XW A <br />/ <br />A17 PROJECT SITE <br />1 <br />Millwright Loop South I LS) - Total <br />- See attachment 1 <br />Drainage Basin 7.76 Acres <br />for detailed basin <br />delination <br />PND - 9/8/21 <br />At Stormwater Basin Plan Review <br />