Laserfiche WebLink
WATERFRONT PLACE CENTRAL A17 PROJECT SOT —HH SUMMARY <br />PORT OF EYERETT—PSA 1-2015405 MD No. 154016-021.02 <br />TABLE OF CONTENTS <br />INTRODUCTION............................................................................................................................................................ I <br />1. PROJECT DESCRIPTION....................................................................................................................................1 <br />2. STORMWATERMANAGEMENT.....................................................................................................................1 <br />3. IMPACTS ON THE MLS STORMWATER SYSTEM....................................................................................1 <br />4. PARCEL A17 COMPLIANCE WITH 2O19 SWIvID4WM1W MINIMUM REQUIREMENTS.....................2 <br />4.1. Minimum requrtenent #1 - Stormwate Site Plan Preparation................................................................2 <br />4.2. Mwmum requirement #2— Construction stormwater Pollution prevention........................................2 <br />4.3. Mndmum requirement#3—Source Control of Pollution........................................................................2 <br />4.4. Minimum requirement #4—preservation of natural drainage systems and murals .............................3 <br />4.5. Mnmum requirement #5—On-site seormweter Management...............................................................3 <br />4.6. Minimum requirement #6— Runoff treamment...........................................................................................3 <br />4.7. Mwmum requirement #7—Flow Conttol..................................................................................................3 <br />4.8. Mndmum requirement # 8- Wetlands Protection.......................................................................................3 <br />4.9. Minimum requirement # 9 —Operation and Maintenance.......................................................................3 <br />ATTACHMENTS <br />Attachment 1 —A17 Proposed Drumge Basins <br />Attachment 2 —MIS Drainage Basins — 2017 — POE TITI Report - Markup <br />Attachment 3 —A17 Stormwara Plans <br />7n 1 <br />