z <br />2 <br />E <br />a <br />SWPPP TEMPORARY EROSION CONTROL NOTES <br />1. NON-COMPLIANCE WITH THE EROSION CONTROL REQUIREMENTS WATER QUALITY REQUIREMENTS AND CLEARING LIMITS <br />VIOLATIONS MAY RESULT IN A TEMPORARY STOP -WORK ORDER UNTIL SAID EROSION CONTROL MEASURES ARE FUNCTIONAL. <br />2. CLEARING LIMITS SHALL BE ESTABLISHED FIRST THEN EROSION CONTROL BEST MANAGEMENT PRACTICES BMPS SHALL BE <br />INSTALLED PRIOR TO ANY SITE DISTURBANCE. THE EROSION/SEDIMENTATION CONTROL FACILITIES SHALL CONSTRUCTED <br />PRIOR TO ANY GRADING EXTENSIVE LAND CLEARING IN ACCORDANCE WITH THE APPROVED CONSTRUCTION STORM <br />WATER POLLUTION PREVENTION <br />TION PLAN (SWPPP). THESE FACILITIES MUST BE SATISFACTORILY MAINTAINED UNTIL <br />CONSTRUCTION AND LANDSCAPING IS COMPLETED, THE PERMANENT VEGETATIVE COVER IS ESTABLISHED AND THE <br />POTENTIAL FOR ON -SITE EROSION HAS PASSED. <br />3. PUBLIC STREETS ARE TO BE KEPT CLEAR OF DIRT AND DEBRIS DURING CONSTRUCTION EXCAVATION AND FILL OPERATIONS. <br />MATERIAL SHALL BE REMOVED FROM THE STREETS BY SWEEPING. PAVED SURFACES MUST BE CLEANED AT THE END OF <br />EACH DAY. <br />4. SEDIMENT CONTROL FACILITIES SHOWN ON THESE PLANS SHALL BE INSTALLED AS PART OF THE PLAN TO REMOVE SEDIMENT <br />FROM THE WATER BEFORE CLEARING AND GRADING IS ALLOWED. THIS MAY INCLUDE SILT FENCES, SWALES, CHANNELS, <br />BERMS, BARRIERS AND OTHER MEASURES. SEE THE CONSTRUCTION SEQUENCE FOR ORDER OF INSTALLATION. <br />S. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES, UNLESS INCONSISTENT WITH SAFETY OR SITE <br />CONSTRAINTS. <br />6. THE CONSTRUCTION PLANS INDICATE INSTALLATION OF BEST MANAGEMENT PRACTICES (BMPS) TO RETAIN ALL SEDIMENT ON <br />SITE. ADDITIONAL MEASURES ARE NORMALLY NEEDED TO REMOVE TURBIDITY AND MEET WATER QUALITY STANDARDS. <br />DURING CONSTRUCTION, THE CONTRACTOR SHALL INSTALL SUCH ADDITIONAL COUNTY APPROVED BMPS AS MAY BE <br />REQUIRED, E.G. BAKER TANK$ OR OTHER SEDIMENTATION FACILITIES, TO PREVENT SEDIMENT OR TURBID WATER FROM <br />LEAVING THE SITE. THE CONTRACTOR MAY CONTACT THE DESIGN ENGINEER (OR THE OWNER'S DESIGNATED EROSION <br />CONTROL PERSON) FOR GUIDANCE ON ADDITIONAL MEASURES. <br />7. STABILIZE ALL EXPOSED AND NON -WORKED SOIL. <br />B. FROM APRIL 1 TO SEPTEMBER 30 NO UN -WORKED SOIL MAY REMAIN EXPOSED FOR MORE THAN 7 DAYS. <br />9. COVER DENUDED AREAS AS SPECIFIED ON THE PLAINS BY APPROPRIATE COVER BMPS (SUCH A$ MULCH, SOD, PLASTIC, AND <br />STRAW). WHERE STRAW MULCH IS REQUIRED, IT SHALL BE APPLIED A MINIMUM OF 2". <br />10. COVER MATERIAL SHALL BE STOCKPILED ON SITE. <br />11. SOIL STOCKPILES SHALL BE STABILIZED AND PROTECTED WITH SEDIMENT RETENTION BMPS WITHIN 24 HOURS. <br />12. GRADING AND CONSTRUCTION SHALL BE TIMED AND CONSTRUCTED IN STAGES TO MINIMIZE SOIL EXPOSURE. <br />CONSTRUCTION $HALL BE TIMED TO RECOGNIZE CONDITIONS CREATED BY THE WEATHER. <br />13. FROM OCTOBER 1 TO MARCH 31 NO UN -WORKED SOIL MAY REMAIN EXPOSED FOR MORE THAN 2 DAYS, <br />14. AN ESTABLISHED GROUND COVER THAT FULFILLS THE REQUIREMENT OF THE APPROVED CONSTRUCTION PLANS IS <br />REQUIRED FOR ACCEPTANCE BY THE COUNTY. WHERE POSSIBLE, MAINTAIN NATURAL VEGETATION FOR SILT CONTROL. <br />a. ALLAREASTO BE SEEDED$HALL BE CULTIVATED BY DISKING. RAKING, HARROWING OR OTHER ACCEPTABLE MEANS. <br />b. PERFORM ALL CULTIVATING ACROSS OR AT RIGHT ANGLES TO THE SLOPE. <br />c. COVER THE SITE WITH MULCH, TOPSOIL OR OTHER SOIL AMENDMENTS. <br />d. IF NECESSARY, SURFACE RUNOFF CONTROL MEASURES SUCH AS GRADIENT TERRACES, INTERCEPTOR DIKE/SWALES, <br />LEVEL SPREADERS, AND SEDIMENT BASINS SHALL BE INSTALLED PRIOR TO SEEDING. <br />e. IMMEDIATELY FOLLOWING FINISH GRADING, PERMANENT VEGETATION $HALL BE APPLIED (MINIMUM 60# PER ACRE), <br />UNLESS OTHERWISE NOTED AS A WETLAND RESTORATION AREA OR OTHERWISE APPROVED FOR ALTERNATIVE <br />LANDSCAPING TREATMENT. THIS IS TO INCLUDE THE FOLLOWING: 35% PERENNIAL RYE GRASS, 50% CREEPING RED <br />FESCUE, 15% COLONIAL BENT GRASS. <br />f. FERTILIZER SHALL BE APPLIED AT 400# PER ACRE OF 10-20-20 (10 POUNDS PER 1100 SQUARE FEET) OR EQUIVALENT. <br />DEVELOPMENTS ADJACENT TO WATER BODIES SHALL USE NON -PHOSPHORUS FERTILIZER. <br />15. UNLESS IN A WETLAND RESTORATION AREA OR AN AREA APPROVED FOR ALTERNATIVE LANDSCOAPING TREATMENT, ALL <br />DISTURBED AREAS SHALL BE SEEDED WITH A PERENNIAL GROUND COVER USING AN APPROVED HYDROSEEDER OR AS <br />OTHERWISE APPROVED BY SNOHOMISH COUNTY. <br />16. PROTECT CUT AND FILL SLOPES FROM EROSIVE FLOWS AND CONCENTRATED FLOWS UNTIL PERMANENT COVER AND <br />DRAINAGE CONVEYANCE SYSTEMS ARE IN PLACE. <br />17. INSTALL INLET PROTECTION ON ALL STORM DRAIN INLETS DURING CONSTRUCTION SO THAT SEDIMENT AND SILT LADEN <br />WATER IS FILTERED OR TREATED TO MINIMIZE SEDIMENT THAT ENTERS THE INLET. <br />18. CHANNELS, DITCHES, SWALES AND OTHER CONVEYANCE SYSTEMS SHALL BE STABILIZED TO PREVENT EROSION DURING AND <br />AFTER CONSTRUCTION. INSTALL OUTLET PROTECTION FOR ALL CULVERTS. <br />19. FOLLOW THE SPECIFIC REQUIREMENTS ON THE PLAN TO CONTROL POLLUTANTS DURING CONSTRUCTION. THE CONTRACTOR <br />AND OWNER SHALL DEVELOP ON GOING PLANS TO CONTROL POLLUTANTS GENERATED DURING CONSTRUCTION, INCLUDING <br />WASTE MATERIALS AND DEMOLITION DEBRIS. THIS INCLUDES MAINTENANCE OF CONSTRUCTION EQUIPMENT, FERTILIZERS, <br />APPLICATION OF CHEMICALS, AND WATER TREATMENT SYSTEMS. THE PLANS SHALL BE UPDATED TO RESPOND TO SITE <br />EXPOSURE AND WEATHER CONDITIONS. <br />20, THE WATER FROM DE -WATERING SYSTEMS FOR TRENCHES, VAULTS AND FOUNDATIONS SHALL BE DISCHARGED INTO A <br />CONTROLLED SYSTEM OR SEDIMENT RETENTION BMP (I.E. BAKER TANK). ADDITIONAL MEASURES ARE NEEDED TO REMOVE <br />TURBIDITY AND MEET WATER QUALITY STANDARDS. UNFILTERED WATER MUST NOT BE RELEASED INTO SENSITIVE AREAS <br />SUCH AS WETLANDS OR DESIGNATED NGPA AREAS. WATER POLLUTION CONTROL SHALL COMPLY WITH SCC 7.53. <br />21. THE OWNER AND CONTRACTOR ARE RESPONSIBLE FOR WATER QUALITY AS FURTHER DEFINED IN THE PROJECT <br />SPECIFICATIONS, THE CONTRACTOR'S CERTIFIED EROSION CONTROL SPECIALIST SHALL BE RESPONSIBLE FOR INSPECTION <br />AND THE WATER QUALITY MONITORING PROGRAM AND SHALL REPORT TO THE OWNER AND TO THE COUNTY AS REQUIRED. <br />22. THE CONSTRUCTION EROSION CONTROL BMPS SHALL BE INSPECTED AFTER EACH SIGNIFICANT RAIN EVENT. MAINTENANCE <br />SHALL BE PERFORMED AS NEEDED TO MAINTAIN THE PERFORMANCE AND FUNCTION. <br />a. SILT BARRIERS AND SEDIMENT PONDS (IF USED) SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT <br />LEAST DAILY DURING PROLONGED RAINFALL. <br />b. NECESSARY REPAIRS TO BARRIERS, CHANNELS, AND PONDS (IF USED) OR REPLACEMENT SHALL BE ACCOMPLISHED <br />PROMPTLY. <br />c. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH RAINFALL FROM SILT BARRIERS AND CHECK DAMS. <br />d. WHEN THE SEDIMENT REACHES THE CLEAN OUT LEVEL IN A SEDIMENT POND, IT SHALL BE REMOVED AND PROPERLY <br />DISPOSED. DEPOSITS MUST BE REMOVED WHEN THE LEVEL OF DEPOSITION REACHES APPROXIMATELY ONE-THIRD <br />THE HEIGHT OF THE BARRIER, CHECK DAM OR OTHER CATCHMENT. <br />e. IF USED, THE EMBANKMENT OF SEDIMENT BASINS SHALL BE CHECKED REGULARLY TO INSURE THAT IT IS <br />STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED BY EROSION OR CONSTRUCTION EQUIPMENT. <br />f. THE EMERGENCY SPILLWAY OF A SEDIMENT POND SHALL BE CHECKED REGULARLY TO INSURE THAT ITS LINING IS <br />WELL ESTABLISHED AND EROSION -RESISTANT. <br />g. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE BARRIER IS NO LONGER REQUIRED SHALL BE DRESSED TO <br />CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. <br />EROSION RISK ASSESSMENT <br />FACTORS ANTICIPATED TO CREATE RISK OF EROSION THROUGHOUT THE PROJECT INCLUDE EXPOSURE OF EXCAVATED $OIL$ <br />TO RAINFALL AND DISTURBANCE OF THE PROJECT SITE BY HEAVY EQUIPMENT. HEAVY RAINFALL CAN ERODE SOILS AND LEAD TO <br />TRANSPORT OF SEDIMENTS OVERLAND, THROUGH OPEN SEWER OR STORM PIPES AS THEY ARE CONSTRUCTED, OR IN <br />DRAINAGE DITCHES. DEWATERING OF THE TRENCHES AND LIFT STATION EXCAVATION WILL ALSO CREATE A RISK OF SEDIMENT <br />TRANSPORT, RELATIVE TO THE AMOUNT OF WATER THAT MUST BE REMOVED. THE SOURCES OF WATER FOR DEWATERING <br />INCLUDE RAINFALL, STORMWATER FLOW, AND GROUNDWATER FLOW. <br />SWPPP EROSION CONTROL PLAN <br />(EXCERPTS OF THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN -THIS PLAN MAY BE REVISED BY THE EROSION CONTROL SPECIALIST TO MEET <br />FIELD CONDITIONS, IF NECESSARY.) <br />1. EROSION PROBLEM AREAS <br />a. THERE ARE CURRENTLY NO KNOWN EROSION PROBLEM AREAS ON SITE. HOWEVER EROSION IS A POSSIBILITY DURING CONSTRUCTION. THE RISK OF <br />EROSION IN THIS AREA MAY BE MITIGATED THROUGH THE USE OF PROPER BEST MANAGEMENT PRACTICES AS DESCRIBED BELOW. SINCE RAINFALL ON THE <br />SITE IS LIKELY TO BE A PRINCIPAL CAUSE OF EROSION, THE RISK OF EROSION WILL BE REDUCED BY SCHEDULING EARTHWORK FOR THE DRY SUMMER <br />SEASON. <br />b. IF THIS PROJECT CONTINUES INTO THE WINTER SEASON, THE FOLLOWING WET WEATHER PRECAUTIONS WILL BE PRACTICED. <br />I. PREVENTION OF TRACKING MUD ONTO ROAD$ THROUGH THE USE OF EQUIPMENT SWEEPING ONSITE. <br />it. EXPOSED PORTIONS OF THE SITE SHALL BE ADEQUATELY COVERED BY STRAW OR OTHER MATERIAL BASED UPON THE WEATHER. STRAW OR <br />APPROVED EQUIVALENT MATERIAL SHALL ALWAYS BE AVAILABLE ON SITE AND READY TO USE. EXPOSED AREAS SHALL BE ADEQUATELY COVERED <br />WHEN RAINING AND AT THE END OF THE DAY IF THE NEXT DAY IS A"NON-WORKING DAY. WEATHER FORECASTS SHALL BE USED TO GOVERN <br />WHETHER WORK WILL COMMENCE OR STOP FOR THE DAY. <br />iii. ALL SITE WORK GENERATING EXPOSED $OIL (WITH THE EXCEPTION OF INSTALLATION AND MAINTENANCE OF EROSION CONTROL BMPS) $HALL CEASE <br />DURING WEATHER CONDITIONS WHEN RAIN GENERATES RUNOFF AND CAUSES EROSION. <br />iv. IF NECESSARY, EARTHWORK SHALL BE PHASED TO MINIMIZE AREAS OF EXPOSED SOIL. <br />v. THE CONTRACTOR SHALL DEVISE A MAINTENANCE AND INSPECTION SCHEDULE WITH AN IDENTIFIED EROSION CONTROL SPECIALIST RESPONSIBLE <br />FOR THESE ITEMS. <br />vi. AN EROSION CONTROL SPECIALIST SHALL BE PRESENT OR ON -CALL THROUGHOUT THE PROJECT DURATION TO INSURE THE BMPS ARE WORKING <br />APPROPRIATELY AND ARE WELL MAINTAINED. THE SPECIALIST SHALL MONITOR THE DISCHARGE FROM THIS SITE AFTER EACH STORM EVENT THAT <br />GENERATES RUNOFF. THEY SHALL ALSO CONDUCT SITE INSPECTION REPORTS ON THE INSTALLED BMPS. THESE REPORTS SHALL BE AVAILABLE ON <br />SITE AND PROVIDED TO SNOHOMISH COUNTY ON A MONTHLY BASIS AND WHEN REQUESTED. THE MONITORING SHALL BE DONE IN A PROFESSIONAL <br />MANNER CONSISTENT WITH CURRENT SAMPLING PROTOCOLS AND REPORTING REQUIREMENTS. <br />vii. VEGETATED BUFFERS AND CRITICAL AREAS SHALL BE PROTECTED, ESPECIALLY THROUGH THE USE OF SILT FENCES AND MINIMIZATION OF SOIL <br />EXPOSURE. <br />AIR. IF NECESSARY, WATER FROM THE PROJECT SITE SHALL BE FILTERED THROUGH AN APPROVED DEVICE SUCH AS A BAKER TANK, PRIOR TO RELEASING <br />IT TO THE VEGETATED WETLAND AREA. THE CONTRACTOR SHALL CREATE/MODIFY THE DEWATERING PLAN BASED UPON SITE CONDITIONS AND SHALL <br />ATTACH IT TO THIS STORMWATER POLLUTION PREVENTION PLAN (SWPPP). <br />2. CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN ELEMENTS <br />a. MARK CLEARING LIMITS(BMP C103- HIGH VISIBILITY PLASTIC) <br />THE CONTRACTOR SHALL MARK CLEARING LIMITS AT THE LIFT STATION SITE, AS SHOWN ON THE PLANS. <br />b. ESTABLISH CONSTRUCTION ACCESS (BMP C105-STABILIZED CONSTRUCTION ENTRANCE) <br />CONSTRUCTION ACCESS WILL BE PAVED ROAD$. AS A PROTECTIVE MEASURE, STREET SWEEPING WILL BE PERFORMED WHEN REQUIRED.. <br />c. CONTROL FLOW RATES )BMP C200 - INTERCEPTOR SWALE: BMP C206 - LEVEL SPREADER) <br />GROUNDWATER FLOW SHALL BE REDUCED BY EXCAVATING DURING DRYER MONTHS WHEN THE WATER TABLE IS LOWEST. FLOW CONTROL MEASURES <br />SUCH AS INTERCEPTOR TRENCHES OR LEVEL SPREADERS SHALL BE IMPLEMENTED IF NEEDED DURING CONSTRUCTION. <br />d. INSTALL SEDIMENT CONTROLS (BMP C233 - SILT FENCE) <br />SEDIMENT CONTROLS INCLUDE A SILT FENCE ALONG THE PERIMETER OF THE SITE, COVERING OF $OIL STOCKPILES, AND INSTALLATION OF STRAW WHEN <br />NECESSARY. EROSION CONTROL BMPS SHALL BE INSTALLED PRIOR TO LAND DISTURBING ACTIVITIES AS NOTED ON THE PLANS. THE EXISTING 24-INCH <br />CPE CULVERT SHALL BE EXTENDED TO THE SOUTH PROPERTY LINE PRIOR TO COMMENCING SIGNIFCANT GRADING ACTIVITY, TO FACILITATE PROTECTION <br />OF THE CULVERT INLET. THE SITE SHALL ALSO BE MONITORED AND TESTED SO THAT TURBIDITY IN THE WATER LEAVING THE AREA WILL NOT EXCEED 5 <br />NTU ABOVE BACKGROUND. <br />e. STABILIZE SOILS BMP C122- NETS AND BLANKETS: BMP C123- PLASTIC COVERING) <br />TO PROTECT THE SOIL STOCKPILES FROM EROSIVE FORCES SUCH AS RAIN, PLASTIC SHEETING, JUTE MATS OR SIMILAR BMPS WILL BE PLACED UPON <br />EXPOSED AND NON -WORKED SOIL THROUGHOUT CONSTRUCTION. PER WET WEATHER REQUIREMENTS, THESE BMPS WILL BE PLACED WITHIN 2 DAYS OF <br />STOCKPILING THE SOIL FROM OCTOBER 1ST THROUGH APRIL 30TH OR IF RAINING. <br />f. PROTECT SLOPES )BMP C122- NETS AND BLANKETS) <br />ANY SLOPES IN THE VICINITY OF THE PROJECT SITE SHALL BE PROTECTED FROM CONCENTRATED FLOWS. STOCKPILE SLOPES SHALL BE PROTECTED AS <br />MENTIONED IN THE "STABILIZE SOILS' SECTION. <br />g. PROTECT DRAIN INLETS (BMP C220 -STORM DRAIN INLET PROTECTION) <br />TO PREVENT SEDIMENT FROM MOVING INTO ANY NEARBY STORM SYSTEM, CATCH BASIN INLET PROTECTION SHALL BE USED WHERE NECESSARY IN THE <br />VICINITY OF THE PROJECT. INLETS AND CULVERT ENTRANCE$ SHALL BE INSPECTED WEEKLY AT A MINIMUM AND DAILY DURING STORM EVENTS AS NOTED <br />ON THE PLANS, SEDIMENT SHALL NOT ACCUMULATE GREATER THAN SIX INCHES IN DEPTH WITHIN THE INLET PROTECTION DEVICE. <br />h. STABILIZE CHANNELS AND OUTLETS(BMP C209- OUTLET PROTECTION) <br />CULVERT INLETS AND OUTLETS SHALL BE ARMORED WITH QUARRY SPALLS AS SHOWN ON THE PLANS. <br />I. CONTROL POLLUTANTS (BMP C233- SILT FENCE) <br />GOOD HOUSEKEEPING PRACTICES AND APPROPRIATE BMPS AS SHOWN ON THE PLANS AND APPROVED BY SNOHOMISH COUNTY WILL BE UTILIZED TO <br />CONTROL POLLUTANTS ON THE SITE. TO ENSURE THIS, A NOTE IS STATED ON THE PLANS REQUIRING ALL POLLUTANTS ON SITE TO BE HANDLED AND <br />DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF SURFACE WATER. ANY WATER THAT IS USED TO CLEAN EQUIPMENT OR IS <br />PUMPED FROM THE EXISTING DRAINAGE FACILITIES SHALL BE FILTERED THROUGH AN APPROVED FILTERING DEVICE AND TESTED PRIOR TO DISCHARGING <br />TO AN UNDEVELOPED PORTION OF THE SITE. <br />j. CONTROL DEWATERING (BMP C251 -CONSTRUCTION STORMWATER FILTRATION) <br />ANY TURBID WATER FROM DEWATERING OPERATIONS THAT MAY OCCUR THROUGHOUT THIS PROJECT SHALL BE CONVEYED TO AN APPROVED FILTER <br />SUCH AS A BAKER TANK AND THEN RELEASED TO AN UNDISTURBED AREA ON SITE. ALL MEASURES SHALL COMPLY WITH SCC 7.53. IF DEWATERING IS <br />REQUIRED THE CONTRACTOR SHALL CREATE/MODIFY THE DEWATERING PLAN BASED UPON SITE CONDITIONS AND SHALL ATTACH IT TO THE <br />STORMWATER POLLUTION PREVENTION PLAN (SWPPP). <br />k. MAINTAIN BMPS <br />THE BMPS SHOWN ON THE PLANS SHALL BE MAINTAINED AND REPAIRED AS NEEDED. SPECIFIC MAINTENANCE REQUIREMENTS ARE LISTED IN THE NOTES <br />AND/OR DETAILS ON THE PLANS AS WELL AS IN THE DRAINAGE REPORT. MONITORING SHALL BE CONDUCTED BY THE DESIGNATED EROSION CONTROL <br />SPECIALIST TO INSURE BMPS ARE WORKING EFFECTIVELY AND ARE NOT DAMAGING FACILITIES OR WATERWAYS DOWNSTREAM OF THE SITE. A NOTE HAS <br />BEEN ADDED TO THE PLANS STATING THAT TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON THE SITE UPON COMPLETION OF THE WORK AS <br />APPROPRIATE. <br />I. MANAGE THE PROJECT <br />EROSION CONTROL SPECIALIST: THE CONTRACTOR'S CERTIFIED EROSION CONTROL SPECIALIST SHALL VERIFY THAT THE ACTIONS NOTED IN THIS <br />STORMWATER POLLUTION PREVENTION PLAN AND ON THE DRAWINGS ARE IMPLEMENTED. <br />PHASING OF CONSTRUCTION: THE FIRST ORDER OF WORK WILL INCLUDE INSTALLING APPROPRIATE BMPS FOR EROSION CONTROL. CONSTRUCTION OF <br />THE NEW 12-INCH BYPASS CULVERT WILL BE REQUIRED AS NOTED ON THE DRAWINGS. PROJECT DEVELOPMENT WILL THEN COMMENCE. THE SITE SHALL <br />BE PROTECTED AS DESCRIBED IN THIS PLAN AND ON THE DRAWINGS. THROUGHOUT THE WORK, THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING <br />ALL BMPS. UPON COMPLETION OF THE WORK, TEMPORARY BMPS SHALL BE REMOVED AS REQUIRED. <br />SEASONAL WORK LIMITATIONS: WORK IS SCHEDULED FOR THE DRY SEASON HOWEVER, IT MAY BE CONDUCTED DURING THE WET WEATHER SEASON OF <br />OCTOBER 1 THROUGH MARCH 31ST. ALL STOCKPILES SHALL BE COVERED WITH PLASTIC SHEETING, STRAW (OR EQUAL) TO MINIMIZE ANY LOSS OF SOIL <br />DURING THE WET WEATHER. THE CONTRACTOR WILL BE RESPONSIBLE FOR CONSISTENTLY MONITORING THE OUTFALLS TO ENSURE ALL APPLICABLE <br />REQUIREMENTS ARE MET AND THAT WATER QUALITY DOWNSTREAM IS NOT BEING COMPROMISED THROUGHOUT THIS PROCESS. IN ADDITION, THE <br />CONTRACTOR'S CERTIFIED EROSION CONTROL SPECIALIST WILL BE RESPONSIBLE FOR ENSURING PROPER BMP MAINTENANCE IS CONDUCTED <br />THROUGHOUT THE SEASON AS WELL AS ENSURING THE COUNTY REQUIREMENTS ARE MET THROUGH TESTING AND OTHER APPROPRIATE METHODS. <br />COORDINATION WITH UTILITIES AND OTHER CONTRACTORS: AS STATED ON THESE PLANS AND IN THE SPECIFICATIONS, THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR COORDINATING ANY UTILITY WORK WITH THE APPROPRIATE AGENCIES. <br />INSPECTION AND MONITORING: THE CONTRACTOR'S EROSION CONTROL SPECIALIST SHALL BE PRESENT OR ON -CALL THROUGHOUT THE PROJECT <br />DURATION TO INSURE THE BMPS ARE WORKING APPROPRIATELY AND ARE WELL MAINTAINED. THE SPECIALIST $HALL CHOOSE APPROPRIATE MONITORING <br />SITES AND NOTE THEM ON BOTH THE GROUND AND ON THE FIELD COPY OF THE PLANS. THE SPECIALIST SHALL MONITOR THE DISCHARGE FROM THIS <br />SITE AFTER EACH STORM EVENT THAT GENERATES RUNOFF. THE SPECIALIST SHALL ALSO CONDUCT SITE INSPECTION REPORTS ON THE INSTALLED <br />BMPS. THE MONITORING SHALL BE DONE IN A PROFESSIONAL MANNER CONSISTENT WITH CURRENT SAMPLING PROTOCOLS AND REPORTING <br />REQUIREMENTS. <br />REPORTING: THE CONTRACTOR IS RESPONSIBLE FOR REPORTING ALL SPILLS OR DISCHARGE OF POLLUTANTS WITHIN 24-HOURS TO THE OWNER. THE <br />SITE INSPECTION REPORTS MENTIONED ABOVE SHALL BE AVAILABLE ON SITE AND PROVIDED TO SNOHOMISH COUNTY ON A MONTHLY BASIS OR WHEN <br />REQUESTED. <br />MAINTENANCE: NO MAINTENANCE ON HEAVY EQUIPMENT IS EXPECTED TO OCCUR ON SITE THROUGHOUT THE PROJECT. <br />MAINTENANCE OF THE CONSTRUCTION SWPPP: THIS PLAN SHALL BE LOCATED ON SITE AT ALL TIMES. THE PLAN WILL BE REVISED ACCORDINGLY IF <br />SIGNIFICANT CHANGES HAVE BEEN MADE TO THE DESIGN, CONSTRUCTION, OPERATION, OR MAINTENANCE OF ANY BMPS. <br />m. PROTECT LOW IMPACT DEVELOPMENT FACILITIES <br />NO LOW IMPACT DEVELOPMENT FACILITIES ARE INTENDED FOR THIS SITE. <br />DEWATERING PLAN <br />DEWATERING DISCHARGE <br />CONTRACTOR SHALL DESIGN, PROVIDE, INSTALL, OPERATE AND MANAGE DEWATERING DISCHARGE <br />FACILITIES TO ACCOMMODATE THE ENCOUNTERED FLOWS IN A MANNER THAT WILL PREVENT EROSION <br />THE CONTRACTOR SHALL NOT ALLOW THE WATER DISCHARGED FROM ANY DEWATERING SYSTEM <br />WELLS OR SUPPLEMENTAL WATER CONTROL SYSTEMS (I.E. SUMPS) TO DEGRADE THE WATER QUALITY <br />OF ANY RECEIVING WATERS. <br />THE DEWATERING DISCHARGE SYSTEM SHALL OPERATE SUCH THAT WATER PUMPED DURING <br />DEWATERING OPERATIONS IS DISCHARGED TO ADJACENT LANDS FOR INFILTRATION ANDIOR <br />CONTROLLED OVERLAND FLOW. THE SYSTEM SHALL DISPOSE OF WATER SO AS NOT TO CAUSE <br />DAMAGE TO PUBLIC OR PRIVATE PROPERTY, TO CAUSE EXCEEDANCES OF WATER QUALITY STANDARDS <br />OR TO CAUSE A NUISANCE OR MENACE TO THE PUBLIC. <br />UIII no] WIWI9401CLeib] 6YN:WOcli*01121&1&11 VIM8:v9AJlaILAIII LEel aDildaq:lNtlaT0LLISCVLyL1 gAK01:70114G,= <br />CONTRACTOR SHALL OBTAIN ACCESS PERMISSION FROM PRIVATE PROPERTY OWNERS FOR ANY <br />DISCHARGE. <br />THE DEWATERING DISCHARGE SYSTEM SHALL MAINTAIN WATER QUALITY STANDARDS FOR SURFACE <br />WATERS BY PERFORMING IN COMPLIANCE WITH CHAPTER 173-201A WAC, WATER QUALITY STANDARDS <br />FOR SURFACE WATERS OF THE STATE OF WASHINGTON, AND ALL REQUIRED PERMITS, INCLUDING BUT <br />NOT LIMITED TO THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT FOR <br />CONSTRUCTION ACTIVITY. <br />THE CONTRACTOR SHALL INSTALL, OPERATE, AND MAINTAIN A WATER TREATMENT SYSTEM TO PROVIDE <br />FOR SETTLING, FILTRATION (IF NEEDED) AND REMOVAL OF SUSPENDED SOLIDS IN THE DISCHARGE <br />FROM THE DEWATERING SYSTEM. <br />THE DISCHARGE SYSTEM MAY CONSIST OF ANY COMBINATION OF CONVEYANCE PIPING, VISQUEEN <br />PADS, FILTER BAGS, DRIP IRRIGATION, SLOTTED OR PERFORATED DISCHARGE PIPING, SPRAY <br />IRRIGATION, OR OTHER MEANS TO APPLY THE WATER OVER A LARGE AREA AT LOW VELOCITY, IN SUCH <br />A MANNER AS TO CAUSE NO EROSION, REMOVAL OF TOPSOIL, OR VIOLATION OF WATER QUALITY <br />STANDARDS IN THE RECEIVING WATERS. <br />CONTRACTOR SHALL ADD OR MOVE DISCHARGE COMPONENTS AS NEEDED TO ENSURE NO OVERLAND <br />FLOW CAUSES $OIL EROSION, LEAVES THE PROJECT SITE, ENTER$ THE ADJACENT PROPERTIES OR <br />ROADWAYS, ENTERS THE ACTIVE CONSTRUCTION AREA, OR CAUSES A VIOLATION OF WATER QUALITY <br />STANDARDS IN THE RECEIVING WATERS. <br />CONTRACTOR SHALL PROVIDE SUFFICIENT DISCHARGE TUBING, FILTER BAGS, OR OTHER DISCHARGE <br />SYSTEMS TO POTENTIALLY APPLY WATER OVER AS MUCH AREA AVAILABLE FOR DISCHARGE AS <br />NEEDED, IF REQUIRED, TO ALLOW SUFFICIENT INFILTRATION TO MITIGATE EROSION ISSUES. <br />FILTER BAGS SHALL BE OF SUFFICIENT NUMBER, SIZE, AND CAPACITY TO HANDLE ANTICIPATED FLOW <br />RATES, AND MUST BE INSPECTED, MAINTAINED, AND REPLACED WHEN FULL OR DAMAGED. SLOTTED OR <br />PERFORATED DRAIN PIPE, IF USED, MUST BE DESIGNED TO DISCHARGE ALONG THE ENTIRE LENGTH AT <br />EQUAL PRESSURES. <br />96Y9:C1:CHmltz(OA IJ 4: Y1 <br />THE CONTRACTOR SHALL PROVIDE TREATMENT OF THE DISCHARGE INCLUDING SUFFICIENT SEDIMENT <br />SETTLING CAPACITY (PONDS, STORAGE TANKS, ETC.) TO ENSURE DISCHARGE DOES NOT EXCEED <br />TURBIDITY STANDARDS AT THE RECEIVING WATERS; AND 10 PPM SUSPENDED SOLIDS (SILT, SILICA, <br />SEDIMENT ETC.) AS MEASURED USING A ROSSUM $AND TESTER IMMEDIATELY PRIOR TO DISCHARGE TO <br />THE DESIGNATED DISCHARGE AREA. <br />THE DEWATERING DISCHARGE TREATMENT SYSTEM SHALL INCLUDE ANY STORAGE TANKS, PLUMBING, <br />PUMPS, FILTRATION SYSTEMS, OTHER EQUIPMENT, APPURTENANCES, AND RELATED WORK TO <br />PERFORM THE FUNCTION OF WATER TREATMENT. <br />196Y9:CtiCH�LP]:IYC ]:IL`C <br />THE CONTRACTOR'S EROSION CONTROL SPECIALIST SHALL ANALYZE DISCHARGE FOR TURBIDITY <br />HOURLY DURING THE FIRST FOUR HOURS OF TESTING, DAILY DURING FIRST WEEK, WEEKLY <br />THEREAFTER, AND AFTER ANY RAINFALL EVENT EXCEEDING 0.25 INCHES PER DAY, WITH A FIELD <br />TURBIDITY METER USING STANDARD METHOD 2130 (STANDARD METHODS FOR THE EXAMINATION OF <br />WATER AND WASTEWATER). THE CONTRACTOR SHALL MEASURE TURBIDITY AT ALL DISCHARGE POINTS <br />TO RECEIVING WATERS OR WETLANDS, AND BACKGROUND. TURBIDITY SHALL BE CALCULATED AS THE <br />AVERAGE (MEAN) FOR ANY NUMBER OF SAMPLES. THE NUMBER AND TIMING OF SAMPLES SHALL BE <br />THE SAME FOR EACH SAMPLING STATION (I.E., BACKGROUND AND DISCHARGE POINTS). THE <br />CONTRACTOR $HALL PROVIDE ADDITIONAL TREATMENT PRIOR TO DISCHARGE, AS NECESSARY, TO <br />MEET THE DISCHARGE LIMITS. <br />THE CONTRACTOR SHALL VISUALLY INSPECT THE DISCHARGE SYSTEM DAILY FOR SYSTEM OPERATION, <br />OVERLAND FLOW, EROSION, AND TURBIDITY THROUGHOUT THE TESTING. <br />THE CONTRACTOR SHALL SUBMIT WEEKLY MONITORING REPORTS TO THE OWNER'S DESIGNATED <br />REPRESENTATIVE DOCUMENTING THE REQUIREMENTS HEREIN. <br />1. ATTEND PRE -CONSTRUCTION MEETING. <br />2. INSTALL CATCH BASIN PROTECTION. <br />3. INSTALL PERIMETER PROTECTION (SILT FENCE, NPGA AREAS, BRUSH BARRIER, ETC.) <br />4. CONDUCT SITE CLEARING AND GRADING. <br />5. INSTALL DRAINAGE FACILITIES AND OTHER UTILITIES. <br />6. COMPLETE PROJECT PER THE PROJECT PLAN <br />7. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH LOCAL JURISDICTION <br />REQUIREMENTS AND MANUFACTURER'S RECOMMENDATIONS. <br />B. RELOCATE SURFACE WATER CONTROLS OR EROSION CONTROL MEASURES, OR INSTALL <br />NEW MEASURES $O THAT AS SITE CONDITIONS CHANGE, THE EROSION AND SEDIMENT <br />CONTROL IS ALWAYS IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS. <br />9. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN TWO DAYS BETWEEN <br />OCTOBER 1ST AND APRIL 30TH OR SEVEN DAYS BETWEEN MAY 1ST AND SEPTEMBER 30TH. <br />10. STABILIZE ALL AREAS WITHIN SEVEN DAYS OF REACHING FINAL GRADE. <br />11. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. <br />12. UPON COMPLETION OF THE PROJECT, STABILIZE ALL DISTURBED AREAS AND REMOVE <br />TEMPORARY BMPS. <br />L city of Everett <br />EVERETT RevimW for Permit 10/29/2020 <br />0 1" 2" <br />1 <br />TWO INCHES AT FULL SCALE. <br />IF NOT, SCALE ACCORDINGLY <br />O <br />Z <br />w <br />Y <br />O <br />w <br />n <br />ul <br />W <br />Tn <br />z <br />F <br />o <br />e <br />n <br />.1 <br />G <br />Z <br />z <br />0 <br />Q <br />z <br />F <br />- <br />a <br />W <br />V <br />O <br />F <br />3 <br />LU <br />W <br />m <br />OZ <br />W <br />M <br />W <br />a <br />Y <br />I..a <br />J <br />W <br />to <br />W <br />N <br />U <br />2 <br />W <br />W <br />x <br />w <br />LLI <br />N <br />Lu <br />% <br />O <br />~ <br />in <br />J <br />o <br />Q <br />N <br />w <br />SHEET: G-3 <br />OF: 6 <br />JOB NO.: 20476.00 <br />m <br />