Laserfiche WebLink
5/ <br />r <br />O/ 5 <br />y <br />EXI$TING UTILITY POLE\ <br />�WRH MOUNTED-'XFMRS > 1/E5�0 O <br />G <br />DOT ELECT. CABINET E <br />SEE DETAIL S/E5.0 <br />/l NOTE 2 G <br />/ / 0 co <br />PCO21'S+ <br />* /p CCU SCOl <br />y D 2/E5.0 G <br />/ yl VAULT \ \.\rC / /1, <br />c/G�S�S� �41 <br />S <br />GG/ S <br />AS <br />9 � <br />S <br />16 <br />\ S <br />C <br />N <br />1 ELECTRICAL SITE PLAN <br />E1.0 SCALE'. 1" = 10'-0" <br />I 5 I 0 <br />TO UTILITY POLE TRANSFORMER <br />COORDINATE WFH SNOPUD. <br />UNDERGROUND SECONDARY CIRCUIT <br />BY SNOHOMISH PUD (SNOPUD) <br />ELECTRICAL UTIUW. (NOTE 3). <br />INUNE METER BASE AND ENCL. ONE Of <br />M BY CONTRACTOR TO SNOPUD <br />USURY STANDARDS. METER BY <br />SNOPUD. <br />NEW SECONDARY CIRCUIT <br />284+I#4NJ`O <br />- 2P-60A MAIN BREAKER <br />PANELBOARD 'PNL Of" (NOTE 1) <br />120/240V, 220IC. SUSE <br />�� NEMA 3R ENCLOSURE <br />/ 2 \ ELECTRICAL ONELINE DIAGRAM <br />E1.0 / SCALE: NONE <br />LOCATCN OUTDOOR <br />FFLFRMI LMUW <br />M1CUNTING: SURFACE <br />PANE SCHEDILE <br />PANE "PTL 01- <br />240I120VOLT.1 PHASE. 3 WRE <br />60AAMPM4NBR5AKSR <br />FACIL" M15TFRM£TER3 <br />Sedon t ai l <br />Nee <br />ON <br /># <br />LOAD DESCRIPTION <br />Breaker <br />Type <br />Demand <br />Type <br />Orcult <br />KVA <br />(AMPS) <br />roe <br />N <br />WA. (AMPS) <br />Joe <br /># <br />CFcua <br />WA <br />(AMPS) <br />Dereed <br />Type <br />Breaker <br />Type <br />LOAD DESCRIPTION <br />OI <br /># <br />we <br />RaseA <br />RI <br />1 <br />VALLTIJGHI <br />1RlUA <br />Light <br />041 <br />(339) <br />1 <br />041 <br />(339) <br />2 <br />1R2M <br />SHARE <br />2 <br />3 <br />MASTERMEIEi3 <br />CttJIROL PAP -CPOt" <br />1RMA <br />Owt <br />1.50 <br />(12 W) <br />3 <br />2.10 <br />(17W) <br />4 <br />0.60 <br />(500) <br />Light <br />1RMA <br />TEEHl EQUIFMENT <br />�T <br />4 <br />5 <br />SLMPRMP <br />TEOT-DEE01" <br />1R20A <br />RBcept <br />1.16 <br />(9.m) <br />5 <br />6 <br />0,18 <br />(150) <br />R:cep11R20A <br />GB4iRALWE <br />RECK"GREC01" <br />6 <br />? <br />T <br />MM4.. <br />MAGNETCR-MMEIBR <br />1RWA <br />2 <br />8 <br />1P." <br />SPAR£ <br />0 <br />9 <br />SPARE <br />1R20A <br />9 <br />10 <br />1R20A <br />SPARE <br />10 <br />11 <br />SPACE <br />11 <br />12 <br />SPACE <br />t2 <br />2�1mPe <br />ID WA041 <br />Load Calculations <br />Notes <br />Connected Demand <br />Demand <br />Load Type <br />LoW (WA) <br />Fedor <br />Load (WA) <br />Msc. mmnums <br />1s0 <br />125 <br />188 <br />Msc Non CnMnueus <br />0.00 <br />1.00 <br />0.00 <br />Receptacle to 1IWVA <br />I'M <br />1.00 <br />1.0 <br />Receptacle > 10 "A <br />000 <br />0.50 <br />0.00 <br />Mol <br />000 <br />1.00 <br />000 <br />Largest Motor <br />000 <br />0.25 <br />0.00 <br />LgM4eg <br />101 <br />1.25 <br />1.26 <br />WAC <br />000 <br />100 <br />000 <br />mclren <br />0ON <br />100 <br />000 <br />Total Demand Load (KVA) <br />4.48 <br />(AMPS) <br />18.65 <br />ELECTRICAL DEVICE TAG LIST <br />TAG ID# <br />DEVICE DESCRIPTION <br />LOCATION <br />CP 01 <br />CONTROLPANEL <br />OUTDOOR <br />DREC Ol <br />DEDICATED RECEPTACLE TO SUMP PUMP <br />VAULT <br />GREC 01 <br />GENERAL USE RECEPTACLE <br />VAULT <br />JBPO1 <br />POWERJUNCTION BOX <br />VAULT <br />MBOI <br />METER BASE <br />OUTDOOR <br />PNLOl <br />PANEL BOARD 240/120V <br />OUTDOOR <br />CONTROL DEVICE TAG LIST <br />TAGID# <br />DEVICE DESCRIPTION <br />LOCATION <br />FLD 01 <br />ISWOl <br />FLOOD SWITCH, SUMP PUMP PIT <br />INTRUSION SWITCH, ACCESS HATCH <br />VAULT <br />VAULT <br />JBC01 <br />CONTROLIUNCTION BOX <br />VAULT <br />MOV <br />MOTOR OPERATED VALVE <br />VAULT <br />NOTES: <br />1. SEE PANELBOARD SCHEDULE ON THIS SHEET <br />FOR BRANCH CIRCUIT INFORMATION. <br />2. PROVIDE 7 SCH 80 PVC CONDUIT FOR <br />SIGNAL COMMUNICATION BETWEEN PULLBOX TO <br />CONTROL PANEL SIGNAL CABLE TO BE <br />PROVIDED BY ??? <br />3. ???POWER SERVICE APPLICATION WILL BE <br />SUBMITTED BY OWNER. WHEN ELECTRICAL <br />INFRASTRUCTURE HAS BEEN PREPARED TO <br />RECEIVE SERVICE, CALL SNOHOMISH PUD AND <br />COORDINATE THE PROCESS OF INSTALLING A <br />NEW ELECTRICAL POWER SERVICE. BE PRESENT <br />DURING STARTUP OF SERVICE. ADJUST <br />INSTRUMENTATION DEVICE TAG LIST <br />TAGID# <br />DEVI CE DESCRIPTION <br />LOCATION <br />1 BS 01 <br />I NSTRUMENTATI ON JUNCTION BOX <br />VAULT <br />MFM <br />MAGNETIC FLOW METER <br />VAULT <br />PT -IN <br />PRESSURE TRANSDUCER INLET <br />VAULT <br />PT -OUT <br />PRESSURE TRANSDUCER OUTLET <br />VAULT <br />POWER CONDUCTORS AND CONDUITSCHEDULE <br />CABLEID <br />SETS <br />FROM <br />TO <br />PHASE <br />NEUT <br />END <br />INSULATION <br />COND <br />CONDUITIASEL <br />POI <br />1 <br />METER BASE "MIS 01" <br />PANEL BOARD"PNLOl" <br />2" <br />#4 <br />THWN <br />2" <br />PC1 <br />Pool <br />POW <br />POM <br />P004 <br />P005 <br />5 <br />PANEL BOARD"PNLO1" <br />JBP01 <br />1#12 <br />1#12 <br />I#12 <br />1#12 <br />1#12 <br />#12 <br />#12 <br />#12 <br />#12 <br />#12 <br />#12 <br />#12 <br />#12 <br />#12 <br />#12 <br />THWN <br />1-1/2" <br />PC 01 <br />POD6 <br />1 <br />2ONTROL PAN EL"CP OP' <br />JBPO1 <br />11N2 <br />#12 <br />#12 <br />THWN <br />1" <br />PCO2 <br />Pool <br />1 <br />JBPO1 <br />SUMP PUMP DED. RECEP"DREC 01"21#12#:12 <br />#12 <br />THWN <br />3/4"POW <br />1 <br />1BPO1 <br />CONTROL PANEL"CP Ol" <br />#12 <br />THWN <br />3/4" <br />P003 <br />1 <br />JBPOl <br />VAULT UGHT <br />K2 <br />THWN <br />3/4" <br />POO4 <br />1 <br />JBPO1 <br />GENERAL USE RECEPT"GREC 01" <br />#12 <br />THWN <br />3/4"PODS <br />1 <br />JBPO1 <br />MAGNETIC FLOW METER"MFM" <br />#12 <br />THWN <br />3/4" <br />P006 <br />1 <br />JBPOL <br />MOTOR OPERATED VALVE"MOV" <br />#12 <br />THWN <br />3/4" <br />CONTROL CONDUCTORS AND CONDUIT SCHEDULE <br />CABLEID <br />FROM <br />TO <br />CONDUCTOR/CABLE <br />INSUI-ATION1 <br />CONDUTTI <br />CONDUIT LABEL <br />OF 01" CONTROL PANEL <br />JBC01 <br />8414+1#12G <br />THWN <br />1-1/2" <br />CC 01 <br />C001 <br />)BC01 <br />MAGNETIC FLOW METER "MFM" <br />2#14+1#12G <br />THWN <br />3/4" <br />C002 <br />)BC01 <br />I NTRLISION SWITCH, VAULT ACCESS HATCH "ISW" <br />FLOODSWITCH "FLD" <br />MFG. RECOMMENDED <br />3/4" <br />C003 <br />)BC01 <br />2#14 <br />3/4" <br />C004 <br />)BC01 <br />MOTOR OPERATED VALVE"MOV" <br />MFG. RECOMMENDED <br />3/4" <br />INSTRUMENTATIONCONDUCTORS ANDCONDUITSCHEDULE <br />CABLE I <br />FROM <br />TO <br />CONDUCTORS/CABLE <br />INSUTATIONCONDUITCONDUITLABEL <br />NOTE <br />SO01A <br />CONTROL PANEL"CP 01" <br />JBS01 <br />8/C#18SHLD <br />1-1/2" <br />3/4„ <br />SC 01 <br />1BSO1 <br />MAGNETIC FLOW METER "MFM" <br />2/C#IBSHLD <br />FLOW RATE <br />S0018 <br />1BS01 <br />MAGNETO FLOW METER"MFM" <br />2/C#18 SHLD <br />TOTAUZED PULSE <br />5002 <br />1BS01 <br />PRESSURE TRANSDUCER INLET "PT -IN" <br />210#18SHLD <br />3/4" <br />S003 <br />1BS01 <br />PRESSURE TRANSDUCER OUTLET "PT -OUT' <br />2/CNI8SHLD <br />3/4" <br />U <br />n <br />m <br />on <br />o <br />n< <br />ro <br />W_N <br />won <br />IYo� <br />wLu <br />� <br />Z a <br />W <br />O Ozm <br />Zw <br />F.Qo <br />J <br />ZZMrA/ w i <br />O§Q3 U <br />1 �w <br />7. <br />O Q y y <br />N <br />o <br />N <br />p <br />w o 0 <br />m <br />0 Z Y O <br />U <br />O D O U Q <br />W <br />J <br />0 <br />❑ <br />0 <br />w <br />Z <br />0 <br />x <br />U <br />a <br />U <br />W <br />U <br />N <br />M <br />J <br />W <br />Lu <br />H <br />3 <br />2 <br />F- <br />LU <br />d K <br />LU <br />G W <br />❑ <br />Ix <br />K <br />LD <br />Y <br />LU <br />az <br />z <br />W <br />W <br />J <br />o <br />(A <br />z Q <br />Q' <br />Lu <br />x <br />W <br />W <br />V% <br />^ <br />z <br />> <br />a <br />O <br />J <br />x <br />Tn <br />z <br />N <br />J <br />a <br />w <br />F <br />N <br />SHEET: E1.0 <br />OF: 6 <br />JOB NO.: 20476.00 <br />DWG:E1.0 <br />