Laserfiche WebLink
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? <br />This may include human burials or old cemeteries. Are there any material evidence, artifacts, <br />or areas of cultural Importance on or near the site? Please list any professional studies <br />conducted at the site to identify such resources. <br />No. <br />c. Describe the methods used to assess the potential impacts to cultural and historic resources <br />on or near the project site. Examples Include consultation with tribes and the department of <br />archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. <br />A review of the Washington Department of Archaelogy and Historic Preservation (DARP) <br />WISAARD Database. <br />d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance <br />to resources. Please include plans for the above and any permits that may be required. <br />None. <br />14. Transportation hJ eU <br />a. Identify public streets and highways serving the site or affected geographic area and <br />describe proposed access to the existing street system. Show on site plans, if any. <br />The project site is accessed via Silver Lake Road. <br />b. Is the site or affected geographic area currently served by public transit? If so, generally <br />describe. If not, what is the approximate distance to the nearest transit stop? <br />Thornton Sullivan Park is served by Everett Transit Route 29. <br />c. How many additional parking spaces would the completed project or non -project proposal <br />have? How many would the project or proposal eliminate? <br />None. <br />all. WIII the proposal require any new or improvements to existing roads, streets, pedestrian, <br />bicycle or state transportation facilities, not Including driveways? If so, generally describe <br />(indicate whether public or private). <br />The proposed project includes crnslruction of a paved trail. <br />e. Will the project or proposal use (or occur in the Immediate vicinity of) water, mil, or air <br />transportation? If so, generally describe. <br />No. <br />f. How many vehicular trips per day would be generated by the completed project or proposal? <br />If known, indicate when peak volumes would occur and what percentage of the volume would <br />be trucks (such as commercial and nonpassenger vehicles). What data or transportation <br />models were used to make these estimates? <br />None. <br />g. Will the proposal Interfere with, affect or be affected by the movement of agricultural and <br />forest products on roads or streets in the area? If so, generally describe. <br />No. <br />wml4w1 <br />