My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11807 SILVER LAKE DR 2024-01-05
>
Address Records
>
SILVER LAKE DR
>
11807
>
11807 SILVER LAKE DR 2024-01-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2024 8:32:22 AM
Creation date
11/1/2023 1:06:10 PM
Metadata
Fields
Template:
Address Document
Street Name
SILVER LAKE DR
Street Number
11807
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 6—Project Description <br />6a. Briefly summarize the overall project. You can provide more detail in eb. 1Lipf <br />The City of Everett proposes to construct a newlimproved paved trail from the intersection of Silver Lake <br />Drive and 121 st St to Silver Lake Rd. Two proposed spurs of the trail going to the parking area are being <br />considered. The proposed trail will be 8 to 10 feel in width. The portion of the trail within 200 feet of the OHM <br />of Silver Lake will be semi pervious pavement. <br />6b. Describe the purpose of the project and why you want or need to perform it. MU <br />The purpose of the project is to improve recreational opportunkies and pathways around Silver Lake and <br />create an accessible, connected recreational route around the lake. <br />6C. Indicate the project category. (Check all that apply) theta] <br />❑ Commercial ❑ Residential ❑ Institutional ❑ Transportation ® Recreational <br />❑ Maintenance ❑ Environmental Enhancement <br />6d. Indicate the major elements of your project. (Check all that apply) [help] <br />❑ Aquaculture <br />❑ Culvert <br />❑ Float <br />❑ Retaining Wall <br />❑ Bank Stabilization <br />❑ Dam / Weir <br />❑ Floating Home <br />(upland) <br />El Road <br />❑ Boat House <br />❑ Dike / Levee / Jetty <br />❑ Geotechnical Survey <br />Scientific <br />El Boat Launch <br />El Ditch <br />❑ Land Clearing <br />Measurement Device <br />❑ Boat Lift <br />❑ Dock / Pier <br />❑ Marina / Moorage <br />❑ Stairs <br />❑ Bridge <br />❑ Dredging <br />❑ Mining <br />❑ Stormwater facility <br />❑ Bulkhead <br />❑ Fence <br />❑ Oulfall Structure <br />❑ Swimming Pool <br />❑ Buoy <br />❑ Ferry Terminal <br />❑ PilinglDolphin <br />❑ Utility Line <br />IT Channel Modification <br />❑ Fishway <br />❑ Raft <br />® Other: Trail <br />0WA-ml,md0Z2 40 PaleliW A <br />
The URL can be used to link to this page
Your browser does not support the video tag.